Case study:Uxbridge Moor Backwater: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(9 intermediate revisions by 2 users not shown) | |||
Line 14: | Line 14: | ||
{{Project overview | {{Project overview | ||
|Status=Planned | |Status=Planned | ||
|Themes=Flood risk management, Habitat and biodiversity, Social benefits | |||
|Country=England | |Country=England | ||
|Main contact forename=Stewart | |Main contact forename=Stewart | ||
|Main contact surname=Pomeroy | |Main contact surname=Pomeroy | ||
|Contact organisation=Groundwork London | |Contact organisation=Groundwork London | ||
|Partner organisations=Colne valley partnership, LB Hillingdon, groundwork, Lock community | |||
|Multi-site=No | |Multi-site=No | ||
|Project summary=Creation of backwater ponds Reasons for enhancements:<br>Enhance/promote green lung adjacent to Uxbridge industrial estate<br>Erosion of paths<br>Water vole colony appears to have died out<br>Unmanaged and deteriorating | |Project summary=Creation of backwater ponds Reasons for enhancements:<br>Enhance/promote green lung adjacent to Uxbridge industrial estate<br>Erosion of paths<br>Water vole colony appears to have died out<br>Unmanaged and deteriorating | ||
Line 25: | Line 27: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Colne and GUC (from confluence with Chess to Ash) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023090 | |||
|WFD water body name=Colne and GUC (from confluence with Chess to Ash) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=2000 m | ||
|Project started=2008/01/01 | |||
|Funding sources=Part of Colne valley park access to nature, Environment Agency, Local business | |||
|Project started= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Biological quality elements=Vertebrates | |||
|Other motivation=Recreation | |||
|Biological quality elements= | |||
|Other motivation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Planform / Channel pattern=Creation of backwater | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 12:28, 1 November 2018
This case study is pending approval by a RiverWiki administrator.
Location: 51° 32' 26.48" N, 0° 29' 40.39" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Stewart |
Main contact surname | Pomeroy |
Main contact user ID | |
Contact organisation | Groundwork London |
Contact organisation web site | |
Partner organisations | Colne valley partnership, LB Hillingdon, groundwork, Lock community |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Creation of backwater ponds Reasons for enhancements:
Enhance/promote green lung adjacent to Uxbridge industrial estate
Erosion of paths
Water vole colony appears to have died out
Unmanaged and deteriorating
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Colne Brook, Fishery/habitat enhancement on the Grand Union Canal, Habitat Improvements on the River Colne at West Drayton
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|