Case study:River Glaven conservation group: Difference between revisions
(XML import) |
No edit summary |
||
(21 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 13: | Line 8: | ||
52.901815,1.061064 | 52.901815,1.061064 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Economic aspects, Fisheries, Monitoring, Spatial planning | |||
|Country=England | |||
|Main contact forename=Ian | |||
|Main contact surname=Shepherd | |||
|Contact organisation=River Glaven Conservation Group | |||
|Themes= | |Contact organisation url=www.riverglaven.co.uk/ | ||
|Partner organisations=Wild Trout Trust, | |||
|Country= | |Multi-site=No | ||
|Project picture=PA230021.JPG | |||
|Main contact forename= | |Picture description=River narrowing using locally coppiced hazel trees | ||
|Project summary=The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects. | |||
|Main contact surname= | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=PA230006.JPG | |||
|Contact organisation= | }} | ||
{{Case study image | |||
|Contact organisation url= | |File name=PA230012.JPG | ||
|Partner organisations= | |||
|Multi-site= | |||
| | |||
|Project | |||
| | |||
| | |||
}} | }} | ||
{{ | {{Image_gallery_end}} | ||
|Subcatchment= | {{Toggle button}} | ||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Glaven | |||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=Glaven | ||
|WFD water body code=GB105034055780 | |||
|WFD water body name=Glaven | |||
|Pre-project morphology=Single channel,High width:depth | |||
|WFD water body code= | |Reference morphology=Single channel,Sinuous,Pool-riffle | ||
|Heavily modified water body=Yes | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|WFD water body name= | |Dominant hydrology=Quick run-off | ||
|Dominant substrate=Gravel,Bedrock,Cobble | |||
|Pre-project morphology= | |River corridor land use=Extensive agriculture,Woodland,Grassland | ||
|Average bankfull channel width category=10 - 50 m | |||
|Reference morphology= | |Average bankfull channel depth category=0.5 - 2 m | ||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
|Dominant hydrology= | |||
|Dominant substrate= | |||
|River corridor land use= | |||
|Average bankfull channel width category= | |||
|Average bankfull channel depth category= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=400 m | ||
|Project started=2003/01/01 | |||
|Works started=2006/01/01 | |||
|Works completed=2006/01/01 | |||
|Project started= | |Total cost category=1 - 10 k€ | ||
|Total1 cost=8 k€ | |||
|Works started= | |Funding sources=Wild Trout Trust,Environment Agency | ||
|Investigation and design Lead organisation=Environment Agency | |||
|Works completed= | |Stakeholder engagement Lead organisation=Environment Agency | ||
|Works and supervision Lead organisation=Environment Agency | |||
|Post-project management and maintenance Lead organisation=Environment Agency | |||
|Monitoring Lead organisation=Environment Agency | |||
|Total cost category= | |Supplementary funding information=Funding also provided by the Cinderella Chalk Rivers Project | ||
|Total1 cost= | |||
|Funding sources= | |||
|Investigation and design Lead organisation= | |||
|Stakeholder engagement Lead organisation= | |||
|Works and supervision Lead organisation= | |||
|Post-project management and maintenance Lead organisation= | |||
|Monitoring Lead organisation= | |||
|Supplementary funding information= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 190: | Line 81: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Re-profiling,Introducing large woody debris, Introduction of gravel, | ||
|Floodplain / River corridor=Connection to wider floodplain, | |||
|Planform / Channel pattern=Channel narrowing,Creation of braided channel | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 238: | Line 116: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/cinderella%20chalk%20rivers.pdf | |||
|Description=Cinderella Chalk Rivers overview | |||
}} | |||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/rgcg%20report.pdf | |||
|Description=RGCG in-river habitat improvement 2006 Report | |||
}} | |||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/wtt%20award%20winner.pdf | |||
|Description=The Glaven Project wins the annual Wild Trout Trust and Orvis Conservation Awards 2007 Professional Category | |||
}} | |||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/glaven%20restoration%20project.pdf | |||
|Description=The River Restoration Centre Case Study Series - Summary of River Glaven Restoration Project | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{ | {{Supplementary Information | ||
|Information= | |Information=The project was named as the winner of the Professional Category at the 2007 Wild Trout Trust and Orvis Conservation Awards, reinforcing it's position as a good example of a successful river restoration project. | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 12:37, 6 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Fisheries, Monitoring, Spatial planning |
Country | England |
Main contact forename | Ian |
Main contact surname | Shepherd |
Main contact user ID | |
Contact organisation | River Glaven Conservation Group |
Contact organisation web site | http://www.riverglaven.co.uk/ |
Partner organisations | Wild Trout Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Nine Chalk Rivers Project - Glaven Catchment, River Restoration at Hunworth (River Glaven)
Site
Project background
Cost for project phases
Supplementary funding informationFunding also provided by the Cinderella Chalk Rivers Project
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information The project was named as the winner of the Professional Category at the 2007 Wild Trout Trust and Orvis Conservation Awards, reinforcing it's position as a good example of a successful river restoration project.
|