Case study:River Glaven conservation group: Difference between revisions
No edit summary |
No edit summary |
||
(16 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 15: | Line 10: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Economic aspects, | |Themes=Economic aspects, Fisheries, Monitoring, Spatial planning | ||
|Country=England | |Country=England | ||
|Main contact forename= | |Main contact forename=Ian | ||
|Main contact surname= | |Main contact surname=Shepherd | ||
|Contact organisation=River Glaven Conservation Group | |||
|Contact organisation=River | |Contact organisation url=www.riverglaven.co.uk/ | ||
|Contact organisation url=www. | |Partner organisations=Wild Trout Trust, | ||
|Multi-site=No | |Multi-site=No | ||
|Project picture=PA230021.JPG | |Project picture=PA230021.JPG | ||
|Picture description=River narrowing using locally coppiced hazel trees | |||
|Project summary=The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects. | |Project summary=The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=PA230006.JPG | |||
}} | |||
{{Case study image | |||
|File name=PA230012.JPG | |||
}} | |||
{{Image_gallery_end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=Glaven | |Subcatchment=Glaven | ||
}} | }} | ||
{{Site | {{Site | ||
|Name= | |Name=Glaven | ||
|WFD water body code=GB105034055780 | |||
|WFD water body name=Glaven | |||
|Pre-project morphology=Single channel,High width:depth | |||
|WFD water body code= | |Reference morphology=Single channel,Sinuous,Pool-riffle | ||
|Heavily modified water body=Yes | |||
|Protected species present=No | |||
|Invasive species present=No | |||
|WFD water body name= | |Dominant hydrology=Quick run-off | ||
|Dominant substrate=Gravel,Bedrock,Cobble | |||
|Pre-project morphology= | |River corridor land use=Extensive agriculture,Woodland,Grassland | ||
|Average bankfull channel width category=10 - 50 m | |||
|Reference morphology= | |Average bankfull channel depth category=0.5 - 2 m | ||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
|Dominant hydrology= | |||
|Dominant substrate= | |||
|River corridor land use= | |||
|Average bankfull channel width category= | |||
|Average bankfull channel depth category= | |||
}} | }} | ||
{{Project background | {{Project background | ||
Line 84: | Line 56: | ||
|Works started=2006/01/01 | |Works started=2006/01/01 | ||
|Works completed=2006/01/01 | |Works completed=2006/01/01 | ||
|Total cost category=1 - 10 k€ | |||
|Total1 cost=8 k€ | |Total1 cost=8 k€ | ||
|Funding sources=Wild Trout Trust,Environment Agency | |Funding sources=Wild Trout Trust,Environment Agency | ||
Line 91: | Line 64: | ||
|Post-project management and maintenance Lead organisation=Environment Agency | |Post-project management and maintenance Lead organisation=Environment Agency | ||
|Monitoring Lead organisation=Environment Agency | |Monitoring Lead organisation=Environment Agency | ||
|Supplementary funding information=Funding also provided by the Cinderella Chalk Rivers Project | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
Line 107: | Line 81: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Re-profiling,Introducing large woody debris, Introduction of gravel, | ||
|Floodplain / River corridor=Connection to wider floodplain, | |||
|Planform / Channel pattern=Channel narrowing,Creation of braided channel | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 155: | Line 116: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{Additional_Documents}} | {{Additional_Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{ | {{Additional links and references header}} | ||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/cinderella%20chalk%20rivers.pdf | |||
|Description=Cinderella Chalk Rivers overview | |||
}} | |||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/rgcg%20report.pdf | |||
|Description=RGCG in-river habitat improvement 2006 Report | |||
}} | |||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/wtt%20award%20winner.pdf | |||
|Description=The Glaven Project wins the annual Wild Trout Trust and Orvis Conservation Awards 2007 Professional Category | |||
}} | |||
{{Additional links and references | |||
|Link=therrc.co.uk/case_studies/glaven%20restoration%20project.pdf | |||
|Description=The River Restoration Centre Case Study Series - Summary of River Glaven Restoration Project | |||
}} | |||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{ | {{Supplementary Information | ||
|Information= | |Information=The project was named as the winner of the Professional Category at the 2007 Wild Trout Trust and Orvis Conservation Awards, reinforcing it's position as a good example of a successful river restoration project. | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 12:37, 6 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Economic aspects, Fisheries, Monitoring, Spatial planning |
Country | England |
Main contact forename | Ian |
Main contact surname | Shepherd |
Main contact user ID | |
Contact organisation | River Glaven Conservation Group |
Contact organisation web site | http://www.riverglaven.co.uk/ |
Partner organisations | Wild Trout Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The objectives of the project were to improve the in-river habitat upstream from Letheringsett Ford, to re-connect the river and floodplain and to develop an experience base which would serve the River Glaven Conservation Group (RGCG) well on other projects.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Nine Chalk Rivers Project - Glaven Catchment, River Restoration at Hunworth (River Glaven)
Site
Project background
Cost for project phases
Supplementary funding informationFunding also provided by the Cinderella Chalk Rivers Project
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information The project was named as the winner of the Professional Category at the 2007 Wild Trout Trust and Orvis Conservation Awards, reinforcing it's position as a good example of a successful river restoration project.
|