Case study:Western Rother Fishery Habitat Enhancement: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 6: Line 6:
}}
}}
{{Project overview
{{Project overview
|Status=In progress
|Status=Complete
|Themes=Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Social benefits
|Themes=Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Social benefits
|Country=England
|Country=England
|Main contact forename=Ses
|Main contact forename=Ses
|Main contact surname=Wright
|Main contact surname=Wright
|Contact organisation=Ouse & Adur Rivers Trust
|Contact organisation=Ouse and Adur Rivers Trust
|Contact organisation url=www.oart.org.uk/
|Partner organisations=Wild Trout Trust, Petworth & Bognor Angling Club
|Multi-site=No
|Multi-site=No
|Project picture=Photos Rother 1.jpg
|Project picture=Photos Rother 1.jpg
Line 25: Line 27:
}}
}}
{{Site
{{Site
|Name=
|WFD water body code=GB107041012810
   
|WFD water body name=Western Rother
   
|Heavily modified water body=No
     
|Protected species present=No
|WFD water body code=
|Invasive species present=No
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project background
{{Project background
|Project started=2012/07/01
|Project started=2012/07/01
|Project completed=2015/03/01
|Project completed=2015/03/01
|Total cost category=100 - 500 k€
|Total1 cost=130
|Funding sources=Defra Catchment Restoration Fund
|Funding sources=Defra Catchment Restoration Fund
}}
}}
Line 94: Line 55:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Bank reprofiling,
   
|Planform / Channel pattern=Diversification of in-channel features,
   
|Other technical measure=Non BAP habitat creation/restoration,
      Bank reprofiling,
|Management interventions=Fencing,
|Floodplain / River corridor=
|Social measures=Community involvement
     
|Planform / Channel pattern=
      Channel features creation,
|Other technical measure=
      Non BAP habitat creation/restoration,
|Management interventions=
      Fencing,
|Social measures=
      Community involvement
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 12:25, 6 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 57' 23.58" N, 0° 35' 53.63" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Social benefits
Country England
Main contact forename Ses
Main contact surname Wright
Main contact user ID
Contact organisation Ouse and Adur Rivers Trust
Contact organisation web site http://www.oart.org.uk/
Partner organisations Wild Trout Trust, Petworth & Bognor Angling Club
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Image of the Rother pre-restoration

Project summary

Edit project overview to modify the project summary.


The Western Rother Fishery Habitat Enhancement Project is a partnership project that will use CRF funds to provide multiple habitat improvements on a section of the lower Rother at Shopham Bridge, just south of Petworth in West Sussex.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district South East
River basin Arun and Western Streams

Subcatchment

River name Western Rother
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 241241 m <br />0.241 km <br />24,100 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB107041012810



Other case studies in this subcatchment: Rother meander reconnection


Site

Name
WFD water body codes GB107041012810
WFD (national) typology
WFD water body name Western Rother
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2012/07/01
Works started
Works completed
Project completed 2015/03/01
Total cost category 100 - 500 k€
Total cost (k€) 130130 k€ <br />130,000 € <br />
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Continuity for organisms, Channel pattern/planform, Substrate conditions, Width & depth variation
Biology Fish, Invertebrates
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Bank reprofiling
Floodplain / River corridor
Planform / Channel pattern Diversification of in-channel features
Other Non BAP habitat creation/restoration
Non-structural measures
Management interventions Fencing
Social measures (incl. engagement) Community involvement
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents




Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information