Case study:Rams Brewery: Difference between revisions
No edit summary |
No edit summary |
||
(3 intermediate revisions by 3 users not shown) | |||
Line 22: | Line 22: | ||
In addition, the development will provide 1,036 residential units in the form of two towers and space for a mix of uses including office, retail, leisure units and a microbrewery. | In addition, the development will provide 1,036 residential units in the form of two towers and space for a mix of uses including office, retail, leisure units and a microbrewery. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=Wandle | |Subcatchment=Wandle (Croydon to Wandsworth) and the R. Gravney | ||
}} | }} | ||
{{Site | {{Site | ||
Line 46: | Line 50: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Bank improvement, | |Bank and bed modifications measure=Bank improvement, | ||
|Floodplain / River corridor= | |Floodplain / River corridor=Displacement of flood defenses, | ||
|Other technical measure=SUDS, green roofs, | |Other technical measure=SUDS, green roofs, | ||
|Social measures= | |Social measures=Riverside walkway, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
Line 61: | Line 65: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | {{Case study documents | ||
Line 72: | Line 74: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Latest revision as of 08:50, 6 June 2017
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Spatial planning |
Country | England |
Main contact forename | James |
Main contact surname | Togher |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Minerva Plc |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Ram Brewery Site is located in Wandsworth Town Centre and comprises the former Youngs Brewery which for over 150 years has been a familiar local landmark for both Wandsworth residents and visitors. The site is divided by the River Wandle which runs south to north and joins the River Thames 500m to the north.
The scheme proposes opening up the site to the public for the first time in its history and provides 1.02ha of high quality public realm, including two public open squares, each framed by the refurbished listed brewery buildings and riverside walkways. In addition, the development will provide 1,036 residential units in the form of two towers and space for a mix of uses including office, retail, leisure units and a microbrewery.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Beddington Park, Beddington Park Enhancements, Boulder Pool and Plough Lane, Durand Close, EDF Weir removal, Eel Pass over tilting weir at Ravensbury Park, Garratt Park, Hackbridge Restoration, Hackbridge weir notch, King Georges Park... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|