Case study:River Avon at East Chisenbury: Difference between revisions
Mattleeson (talk | contribs) No edit summary |
No edit summary |
||
(23 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 13: | Line 8: | ||
51.27,-1.80899 | 51.27,-1.80899 | ||
}} | }} | ||
{{ | {{Project overview | ||
|Status= | |Status=Complete | ||
|Themes=Flood risk management, Habitat and biodiversity, Monitoring, Social benefits, Spatial planning | |||
|Country=England | |||
|Main contact forename=John | |||
|Main contact surname=Rattray | |||
|Contact organisation=Wessex Chalkstreams Project | |||
|Themes= | |Contact organisation url=www.wiltshirewildlife.org/what-we-do/wessexchalksstreams | ||
|Partner organisations=Wiltshire Chalk Streams, Environment Agency, Wessex Water, Natural England, Wiltshire Wildlife Trust, Chisenbury Fishing Syndicate, Cain Bio-Engineering Ltd | |||
|Country= | |Name of parent multi-site project=Case_study:River Avon Stream project | ||
|Multi-site=No | |||
|Main contact forename= | |Project picture=IMGP6954.JPG | ||
|Picture description=Restored channel - berm feature installed to narrow channel. Courtesy of the River Restoration Centre. | |||
|Main contact surname= | |Project summary=The River Avon and its major tributaries are recognised as a Special Area of Conservation for their rare habitats and species, including flowing water vegetation (eg. ranunculus and water-crowfoot), Atlantic salmon, Bullhead, brook and sea lamprey, water vole and otter. | ||
The restoration project at East Chisenbury is part of the Wessex Chalk Streams PRoject (WCSP), which began in 1999 - a partnership between the Wiltshire Wildlife Trust, Natural England, the Environment Agency, Wessex Water and the Wiltshire Fishery Association. the project is focused on restoring river and wetland habitat, while helping to achieve targets under the Wiltshire & Swindon and Wessex Water Biodiversity Action Plans (BAPs). | |||
|Contact organisation= | The project at East Chisenbury was completed in two phases: | ||
|Contact organisation url= | * Phase 1 (2005): Trial project to restore a 70m reach below Compton Bridge which had been subject to heavy dredging - Total Cost: £30,000. | ||
|Partner organisations= | * Phase 2 (2009): Restoration of a 650m reach upstream of Compton Bridge. Involved use of successful 'coir net' technique to re-introduce sinuosity and hydromorphological function to the overwide channel. | ||
*Further information regarding aims, objectives, project successes and pre/post restoration project photos are available in the attached Wessex Chalk Streams Project report (see bottom of page). | |||
|Name of parent multi-site project= | |||
|Project picture= | |||
|Picture description= | |||
|Project summary= | |||
}} | }} | ||
{{ | {{Image_gallery}} | ||
|Subcatchment= | {{Image_gallery_end}} | ||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | |||
|Subcatchment=Hampshire Avon (Upper) | |||
}} | }} | ||
{{Site | {{Site | ||
Line 61: | Line 49: | ||
|Reference morphology=Sinuous,Pool-riffle | |Reference morphology=Sinuous,Pool-riffle | ||
|Heavily modified water body=Yes | |Heavily modified water body=Yes | ||
|Site designation=EU - Special Area of Conservation | |||
|Local site designation=SSSI (Site of Special Scientific Interest) | |||
|Protected species present=No | |Protected species present=No | ||
|Invasive species present=No | |Invasive species present=No | ||
Line 96: | Line 86: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Deflectors,Tree management,Bed raising,Marginal planting, Introducing large woody debris, | ||
|Floodplain / River corridor=Reconnection to the riparian zone | |||
|Planform / Channel pattern=Creation of wooden deflectors, Channel narrowing, | |||
|Floodplain / River corridor= | |||
|Planform / Channel pattern= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} | ||
Line 256: | Line 233: | ||
{{Monitoring_documents}} | {{Monitoring_documents}} | ||
{{Monitoring_documents_end}} | {{Monitoring_documents_end}} | ||
{{ | {{Additional Documents}} | ||
{{Additional_Documents_end}} | {{Additional_Documents_end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} | ||
{{Additional links and references | {{Additional links and references | ||
|Link=publications.environment-agency.gov.uk/pdf/GESW0910BSTR-E-E.pdf | |Link=publications.environment-agency.gov.uk/pdf/GESW0910BSTR-E-E.pdf | ||
|Description=WFD Status for Hampshire Avon (Middle) - See P. 1308. | |Description=WFD Status for Hampshire Avon (Middle) - See P. 1308. | ||
}} | |||
{{Additional links and references | |||
|Link=www.youtube.com/watch?v=4goBfNnmS4s | |||
|Description=Youtube Video: Wessex Chalk Streams Project | |||
}} | |||
{{Additional links and references | |||
|Link=www.cainbioengineering.co.uk/case-studies/river-case-study-river-restoration-chisenbury-phase-i/ | |||
|Description=Cain Bio-Engineering Ltd - Case Study Phase I | |||
}} | |||
{{Additional links and references | |||
|Link=www.cainbioengineering.co.uk/case-studies/river-case-study-river-restoration-east-chisenbury/ | |||
|Description=Cain Bio-Engineering Ltd - Case Study Phase II | |||
}} | }} | ||
{{Additional_links_and_references_footer}} | {{Additional_links_and_references_footer}} | ||
{{Supplementary_Information | {{Supplementary_Information | ||
|Information= | |Information= | ||
}} | }} | ||
{{Case_study_upload}} | {{Case_study_upload}} | ||
{{Toggle content end}} |
Latest revision as of 15:26, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Monitoring, Social benefits, Spatial planning |
Country | England |
Main contact forename | John |
Main contact surname | Rattray |
Main contact user ID | |
Contact organisation | Wessex Chalkstreams Project |
Contact organisation web site | http://www.wiltshirewildlife.org/what-we-do/wessexchalksstreams |
Partner organisations | Wiltshire Chalk Streams, Environment Agency, Wessex Water, Natural England, Wiltshire Wildlife Trust, Chisenbury Fishing Syndicate, Cain Bio-Engineering Ltd |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The River Avon and its major tributaries are recognised as a Special Area of Conservation for their rare habitats and species, including flowing water vegetation (eg. ranunculus and water-crowfoot), Atlantic salmon, Bullhead, brook and sea lamprey, water vole and otter.
The restoration project at East Chisenbury is part of the Wessex Chalk Streams PRoject (WCSP), which began in 1999 - a partnership between the Wiltshire Wildlife Trust, Natural England, the Environment Agency, Wessex Water and the Wiltshire Fishery Association. the project is focused on restoring river and wetland habitat, while helping to achieve targets under the Wiltshire & Swindon and Wessex Water Biodiversity Action Plans (BAPs).
The project at East Chisenbury was completed in two phases:
- Phase 1 (2005): Trial project to restore a 70m reach below Compton Bridge which had been subject to heavy dredging - Total Cost: £30,000.
- Phase 2 (2009): Restoration of a 650m reach upstream of Compton Bridge. Involved use of successful 'coir net' technique to re-introduce sinuosity and hydromorphological function to the overwide channel.
- Further information regarding aims, objectives, project successes and pre/post restoration project photos are available in the attached Wessex Chalk Streams Project report (see bottom of page).
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Gunville Phase I, Longstreet A 91a, River Avon Habitat Enhancement, Fifield, West Amesbury
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|