Case study:Nar SSSI project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(19 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 17: Line 12:
|Themes=Hydromorphology, Monitoring, Spatial planning
|Themes=Hydromorphology, Monitoring, Spatial planning
|Country=England
|Country=England
|Main contact forename=Nick
|Main contact forename=James
|Main contact surname=Elbourne
|Main contact surname=Holloway
|Main contact id=NickRRC
|Contact organisation=River Restoration Centre
|Contact organisation=River Restoration Centre
|Contact organisation url=www.therrc.co.uk
|Contact organisation url=www.therrc.co.uk
Line 27: Line 21:
|Project summary=The existing river was an artificially wide channel with virtually no gradient. The existing wooden flow deflectors installed between 2002 and 2003 were insufficient in their attempts to enhance flow diversity. The project successfully narrowed the river through the construction of artificial berms mimicking those found naturally and the excavation of pools.
|Project summary=The existing river was an artificially wide channel with virtually no gradient. The existing wooden flow deflectors installed between 2002 and 2003 were insufficient in their attempts to enhance flow diversity. The project successfully narrowed the river through the construction of artificial berms mimicking those found naturally and the excavation of pools.
}}
}}
{{Case_study_subcatchment
{{Image gallery}}
|Subcatchment=
{{Case study image
   
|File name=Shoulder Mar 11.JPG
   
|Caption=Deflector transformed to shoulder, March 2011
      Nar
}}
{{Case study image
|File name=Shoulder Jul 11.JPG
|Caption=Deflector transformed to shoulder, July 2011
}}
{{Case study image
|File name=Sinous Mar 11.JPG
|Caption=Added sinuosity to the river, March 2011 
}}
 
{{Image_gallery_end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment
|Subcatchment=Nar to confl with Blackborough Drain
}}
}}
{{Site
{{Site
|Name=Narbough Trout Fishery
|Name=Narbough Trout Fishery
|WFD water body code=GB105033047791
|WFD water body name=Nar to confl with Blackborough Drain
|Pre-project morphology=Single channel, Straight, Embanked, High width:depth
|Pre-project morphology=Single channel, Straight, Embanked, High width:depth
|Reference morphology=Sinuous, Pool-riffle
|Reference morphology=Sinuous, Pool-riffle
Line 43: Line 53:
|Species=Water Vole
|Species=Water Vole
|Dominant hydrology=Groundwater
|Dominant hydrology=Groundwater
|Dominant substrate=Silt, Sand,  
|Dominant substrate=Silt, Sand,
|River corridor land use=Urban, Woodland, Grassland,  
|River corridor land use=Urban, Woodland, Grassland,
|Average bankfull channel width category=10 - 50 m
|Average bankfull channel width category=10 - 50 m
|Average bankfull channel depth category=5 - 10 m
|Average bankfull channel depth category=5 - 10 m
}}
}}
{{Project_background
{{Project background
|Reach length directly affected=
|Reach length directly affected=1000 m
   
|Project started=2011/02/01
   
|Works completed=2011/03/01
      1000 m
|Total1 cost=3 k€
|Project started=
|Supplementary funding information=The entire project, covering 1 km of channel, was delivered by a team of 3 people in less than 3 days and for under 3 thousand pounds. Accordingly, although early days, it seems that the Nar SSSI project can be viewed as a successful low-cost ‘quick win’ project in a constrained site.
      2011/02/01
|Works started=
     
|Works completed=
      2011/03/01
|Project completed=
     
|Total cost category=
      Less than 10 k€
|Total1 cost=
      3 k€
|Funding sources=
     
|Investigation and design cost category=
     
|Invst and design cost=
     
|Investigation and design Lead organisation=
     
|Investigation and design Other contact forename=
     
|Investigation and design Other contact surname=
     
|Stakeholder1 engagement cost category=
     
|stk engagement cost=
     
|Stakeholder engagement Lead organisation=
     
|Stakeholder engagement Other contact forename=
     
|Stakeholder engagement Other contact surname=
     
|Works1 and supervision cost category=
     
|Wrk and supervision cost=
     
|Works and supervision Lead organisation=
     
|Works and supervision Other contact forename=
     
|Works and supervision Other contact surname=
     
|Post-project1 management and maintenance cost category=
     
|Post-project2 management and maintenance cost=
     
|Post-project management and maintenance Lead organisation=
     
|Post-project management and maintenance Other contact forename=
     
|Post-project management and maintenance Other contact surname=
     
|Monitoring1 cost category=
     
|Monitoring2 cost=
     
|Monitoring Lead organisation=
     
|Monitoring Other contact forename=
     
|Monitoring Other contact surname=
     
|Supplementary funding information=
     
}}
}}
{{Motivations
{{Motivations
Line 135: Line 80:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=Creation of shoulders, Embankment creation, Creation of pools,
   
|Floodplain / River corridor=Ensure floodplains left unmodified
   
|Planform / Channel pattern=Channel narrowing,
      Creation of shoulders,Material was removed from bed to build out banks,Creation of pools downstream
|Other technical measure=Maintain water vole habitat
|Floodplain / River corridor=
     
|Planform / Channel pattern=
      Narrowing of channel
|Other technical measure=
      Maintain water vole habitat
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 199: Line 132:
{{Monitoring_documents}}
{{Monitoring_documents}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Image_gallery}}
{{Additional Documents}}
{{Image_gallery_end}}
 
{{Additional_Documents}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
{{Additional_links_and_references_header}}
{{Additional links and references header}}
{{Additional links and references
|Link=www.therrc.co.uk/case_studies/rrc%20case%20study%20-%20narborough%202011.pdf
|Description=River Restoration Centre Case Study
}}
{{Additional links and references
|Link=www.youtube.com/watch?v=aej4PTzf_0U&feature=plcp
|Description=River Nar berm creation video
}}
{{Additional_links_and_references_footer}}
{{Additional_links_and_references_footer}}
{{Supplementary_Information
{{Supplementary_Information
Line 227: Line 167:
}}
}}
{{Case_study_upload}}
{{Case_study_upload}}
{{Toggle content end}}

Latest revision as of 15:04, 1 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 41' 59.18" N, 0° 36' 42.61" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Hydromorphology, Monitoring, Spatial planning
Country England
Main contact forename James
Main contact surname Holloway
Main contact user ID
Contact organisation River Restoration Centre
Contact organisation web site http://www.therrc.co.uk
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
River Nar after the work was completed

Project summary

Edit project overview to modify the project summary.


The existing river was an artificially wide channel with virtually no gradient. The existing wooden flow deflectors installed between 2002 and 2003 were insufficient in their attempts to enhance flow diversity. The project successfully narrowed the river through the construction of artificial berms mimicking those found naturally and the excavation of pools.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Deflector transformed to shoulder, March 2011
Deflector transformed to shoulder, July 2011
Added sinuosity to the river, March 2011


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin North West Norfolk

Subcatchment

River name Nar to confl with Blackborough Drain
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 9595 m <br />0.095 km <br />9,500 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105033047791



Other case studies in this subcatchment: Castle Acre Rehabilitation Project, Narborough Rehabilitation Project, River Nar Castle Acre Common WEG project, River Nar Restoration Project, River Nar, Mileham River Restoration Project, West Lexham Rehabilitation Project


Site

Name Narbough Trout Fishery
WFD water body codes GB105033047791
WFD (national) typology
WFD water body name Nar to confl with Blackborough Drain
Pre-project morphology Single channel, Straight, Embanked, High width:depth
Reference morphology Sinuous, Pool-riffle
Desired post project morphology
Heavily modified water body Yes
National/international site designation UK - Site of Special Scientific Interest
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest Water Vole
Dominant hydrology Groundwater
Dominant substrate Silt, Sand
River corridor land use Urban, Woodland, Grassland
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 5 - 10 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 1000 m1 km <br />100,000 cm <br />
Project started 2011/02/01
Works started
Works completed 2011/03/01
Project completed
Total cost category
Total cost (k€) 3 k€3,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring

Supplementary funding information

The entire project, covering 1 km of channel, was delivered by a team of 3 people in less than 3 days and for under 3 thousand pounds. Accordingly, although early days, it seems that the Nar SSSI project can be viewed as a successful low-cost ‘quick win’ project in a constrained site.



Reasons for river restoration

Mitigation of a pressure Flood defence
Hydromorphology Quantity & dynamics of flow, Flow velocities, Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project Enhancement of flow diversity


Measures

Structural measures
Bank/bed modifications Creation of shoulders, Embankment creation, Creation of pools
Floodplain / River corridor Ensure floodplains left unmodified
Planform / Channel pattern Channel narrowing
Other Maintain water vole habitat
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flow velocities Yes Yes Yes Awaiting results
Quantity & dynamics of flow Yes Yes Yes Awaiting results

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos



Additional links and references

Link Description
http://www.therrc.co.uk/case studies/rrc%20case%20study%20-%20narborough%202011.pdf River Restoration Centre Case Study
http://www.youtube.com/watch?v=aej4PTzf 0U&feature=plcp River Nar berm creation video

Supplementary Information

Edit Supplementary Information