Case study:River Restoration at Hunworth (River Glaven): Difference between revisions
No edit summary |
No edit summary |
||
Line 71: | Line 71: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure=Channel reprofiling | |Bank and bed modifications measure=Channel reprofiling, installation of cattle drinks, Re-introducing gravel, | ||
|Floodplain / River corridor=Removal of embankments, | |Floodplain / River corridor=Removal of embankments, | ||
|Planform / Channel pattern=Increase in sinuosity, | |Planform / Channel pattern=Increase in sinuosity, | ||
|Management interventions=Reduced maintenance | |Management interventions=Reduced maintenance | ||
}} | }} |
Revision as of 12:45, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | http://http://www.wildtrout.org/content/river-glaven-hunworth |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology, Land use management - agriculture |
Country | England |
Main contact forename | Ian |
Main contact surname | Shepperd |
Main contact user ID | |
Contact organisation | River Glaven Conservation Group |
Contact organisation web site | http://www.riverglaven.co.uk/ |
Partner organisations | Environment Agency, Centre for Fisheries and Aquaculture Science, Wild Trout Trust |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The river restoration work carried out on the River Glaven at Hunworth was done with a view to returning the river to a more natural state. The scheme involved a number of organisations, including the Environment Agency, the Wild Trout Trust, the River Glaven Conservation Group and the Centre for Environment, Fisheries and Aquaculture. A variety of techniques were employed, including channel reprofiling, the reintroduction of gravels and the installation of cattle drinks.
Since the works were completed in 2010 the River Glaven (Waterbody ID: GB105034055780) has improved from Moderate ecological status (as designated in the Anglian River Basin Management Plan) to Good ecological status, with specific improvements in macroinvertebrate and fish populations.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Nine Chalk Rivers Project - Glaven Catchment, River Glaven conservation group
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|