Case study:Moreton Channel Gravel Reprofiling: Difference between revisions
Alymaxwell (talk | contribs) No edit summary |
No edit summary |
||
Line 52: | Line 52: | ||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bed reprofiling, Habitat diversification, Large woody derbis dams, Creation of pools, Gravel berms, | ||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} |
Revision as of 08:21, 1 June 2017
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Alasdair |
Main contact surname | Maxwell |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The whole of the Moreton channel reach, downstream of the main house had been identified for re-profiling. A survey undertaken showed cross-sections of a fairly uniform profile, which could be improved. Works created a range of profiles along the reach including new pools and riffles and overall a more varied morphology. This has in turn enabled the river to support a more diverse ecology including a more varied habitat for 0+ up to adult salmonids. The works involved the use of a long reach excavator to move existing bed material within the channel. No material was brought on to the site or removed.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: 2e Lower Woodsford River and Floodplain Enhancement, Bockhampton Enhancement, Hurst Bridge (downstream), Louds Mill (Downstream)m Enhancement, Lower Bockhampton, Lower Woodsford, Martins River Island, North Channel Upper Reach, River Frome Rehabilitation Plan, Unit 1b - Long Bridge to Downstream of Louds Mill... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|