Case study:Amwell Loop: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 27: Line 27:
{{Site
{{Site
|WFD water body code=GB106038033240
|WFD water body code=GB106038033240
|WFD water body name=Lee Navigation (Hertford and Ware)
|Heavily modified water body=No
|Heavily modified water body=No
|Protected species present=No
|Protected species present=No
Line 37: Line 38:
}}
}}
{{Motivations
{{Motivations
|Hydromorphological quality elements=
|Specific mitigation=Flood risk management,
   
   
     
|Biological quality elements=
     
|Physico-chemical quality elements=
     
|Specific mitigation=
     
|Other motivation=
     
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=habitat improvements, Deflectors,
   
|Floodplain / River corridor=Tree planting,
   
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Latest revision as of 07:40, 31 May 2017

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 47' 49.84" N, 0° 0' 2.16" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology
Country England
Main contact forename John
Main contact surname Bryden
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site
Partner organisations British Waterways, Herts and Middlesex Wildlife Trust
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


1km River restoration - Flood risk management project with habitat enhancement. Mitigation for capital works on tumbling bay weir.

Reach enhancement through use of deflectors and tree works. Aims (improved flow, river restoration, creating a self sustaining channel).

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin Upper Lee

Subcatchment

River name Lee Navigation (Hertford and Ware)
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 113113 m <br />0.113 km <br />11,300 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Improved grassland
Waterbody ID GB106038033240



Other case studies in this subcatchment: Sainsburys, Hertford


Site

Name
WFD water body codes GB106038033240
WFD (national) typology
WFD water body name Lee Navigation (Hertford and Ware)
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 1000 m1 km <br />100,000 cm <br />
Project started
Works started
Works completed
Project completed
Total cost category 10 - 50 k€
Total cost (k€)
Benefit to cost ratio
Funding sources Capital works scheme

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Flood risk management
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications habitat improvements, Deflectors
Floodplain / River corridor Tree planting
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information