Case study:River Mease Waterside Care: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 36: Line 36:
|Project completed=2014/01/01
|Project completed=2014/01/01
}}
}}
{{Motivations}}
{{Motivations
|Specific mitigation=Invasive species,
}}
{{Measures
{{Measures
|Other technical measure=removal of invasive non-native species (bankside vegetation),  
|Other technical measure=removal of invasive non-native species (bankside vegetation),  

Revision as of 13:33, 4 January 2017

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 42' 39.54" N, 1° 34' 21.19" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.trentriverstrust.org/site/mease-watersidecare
Themes Habitat and biodiversity, Social benefits
Country England
Main contact forename Alan
Main contact surname Graham
Main contact user ID User:JoshRRC
Contact organisation Trent Rivers Trust
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


In 2014 Trent Rivers Trust have completed a four year program of invasive species control along the Gilwiskaw Brook and River Mease. We have been working with farmers and community members to control the invasive species Himalayan Balsam from the banks of the River Mease. This has resulted in a greatly reduced abundance of Himalayan Balsam providing an opportunity for the native river vegetation to recover from this dominating plant. To read the latest newsletter please click on the link to the right of the page on the Project web site url link provided above. We are continuing to raise awareness of the River Mease through attending country fairs and shows in the catchment. This has provided the opportunity to chat to residents about their special river, places to access it and how to care for its future. The invasive species Himalayan Balsam has been widespread among the banks of the river in recent years. It out competes the native flora of the bank side resulting in poor species diversity and increased erosion risk. It can spread very quickly, particularly along rivers and watercourses.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Humber
River basin Tame Anker and Mease

Subcatchment

River name River Mease from Hooborough Brook to Trent
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 134134 m <br />0.134 km <br />13,400 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB104028046560



Site

Name
WFD water body codes GB104028046560
WFD (national) typology
WFD water body name River Mease from Hooborough Brook to Trent
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed 2014/01/01
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Invasive species
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other removal of invasive non-native species (bankside vegetation)
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information