Case study:Woodsford Channel: Difference between revisions
Jump to navigation
Jump to search
Alymaxwell (talk | contribs) No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity, Hydromorphology | |Themes=Habitat and biodiversity, Hydromorphology | ||
Line 14: | Line 13: | ||
|Main contact id=Alymaxwell | |Main contact id=Alymaxwell | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Name of parent multi-site project=Case_study:River Frome Rehabilitation Plan | |||
|Multi-site=No | |Multi-site=No | ||
| | |Project picture=4300.JPG | ||
|Picture description=View of one of the LWD structures installed as part of the Woodsford Channel Project | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
Line 21: | Line 22: | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
{{Site}} | |Subcatchment=Frome Dorset (Lower) & Furzebrook Stream | ||
}} | |||
{{Site | |||
|WFD water body code=GB108044009690 | |||
|WFD water body name=Frome Dorset (Lower) & Furzebrook Stream | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|Invasive species present=No | |||
}} | |||
{{Project background}} | {{Project background}} | ||
{{Motivations}} | {{Motivations}} |
Latest revision as of 11:16, 2 November 2015
This case study is pending approval by a RiverWiki administrator.
Location: 50° 42' 52.61" N, 2° 21' 2.63" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Aly |
Main contact surname | Maxwell |
Main contact user ID | User:Alymaxwell |
Contact organisation | Environment Agency |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: 2e Lower Woodsford River and Floodplain Enhancement, Bockhampton Enhancement, Hurst Bridge (downstream), Louds Mill (Downstream)m Enhancement, Lower Bockhampton, Lower Woodsford, Martins River Island, Moreton Channel Gravel Reprofiling, North Channel Upper Reach, River Frome Rehabilitation Plan... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|