Case study:Sainsburys, Hertford: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
(8 intermediate revisions by one other user not shown) | |||
Line 14: | Line 14: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Flood risk management, Habitat and biodiversity | |||
|Country=England | |Country=England | ||
|Main contact forename=Sarah | |Main contact forename=Sarah | ||
Line 20: | Line 21: | ||
|Contact organisation url=www.gov.uk/government/organisations/environment-agency | |Contact organisation url=www.gov.uk/government/organisations/environment-agency | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=Removal of sheet steel piling and reprofiling and naturalisation of the bank for 120m. Remaining sheet piling which cannot be removed will be brick clad and coir rolls placed at base of piling. Redevelopment of site for a Sainsburys supermarket on the banks of the River Lee. | |Project summary=Removal of sheet steel piling and reprofiling and naturalisation of the bank for 120m. Remaining sheet piling which cannot be removed will be brick clad and coir rolls placed at base of piling. Redevelopment of site for a Sainsburys supermarket on the banks of the River Lee.<br> | ||
Funding and commitment to delivery. Flood Defence Consent has been granted and works are due to start on site imminently; Expected duration of works is 2 months. | |||
}} | }} | ||
{{Image_gallery}} | {{Image_gallery}} | ||
Line 26: | Line 28: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Lee Navigation (Hertford and Ware) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106038033240 | |||
|WFD water body name=Lee Navigation (Hertford and Ware) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{ | {{Project background | ||
|Reach length directly affected= | |Reach length directly affected=150 m | ||
|Project started=2011/01/01 | |||
|Works completed=2011/01/01 | |||
|Total cost category=500 - 1000 k€ | |||
|Project started= | |Funding sources=Private developers | ||
|Works completed= | |||
|Total cost category= | |||
|Funding sources= | |||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Riparian development | |||
|Specific mitigation= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling, Installation of coir rolls, Removing of sheet piling | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 10:53, 27 October 2015
This case study is pending approval by a RiverWiki administrator.
Location: 51° 47' 53.23" N, 0° 4' 47.69" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Sarah |
Main contact surname | Smith |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Removal of sheet steel piling and reprofiling and naturalisation of the bank for 120m. Remaining sheet piling which cannot be removed will be brick clad and coir rolls placed at base of piling. Redevelopment of site for a Sainsburys supermarket on the banks of the River Lee.
Funding and commitment to delivery. Flood Defence Consent has been granted and works are due to start on site imminently; Expected duration of works is 2 months.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Amwell Loop
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|