Case study:Roxbourne Park: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
(3 intermediate revisions by one other user not shown) | |||
Line 26: | Line 26: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Yeading Brook (west arm) | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023060 | |||
|WFD water body name=Yeading Brook (west arm) | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project background | {{Project background | ||
Line 93: | Line 43: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Biological quality elements=Fish, Invertebrates, Vertebrates, Macrophytes | |||
|Biological quality elements= | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Floodplain / River corridor=Creation of wetland | |||
|Floodplain / River corridor= | |||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 10:49, 27 October 2015
This case study is pending approval by a RiverWiki administrator.
Location: 51° 34' 26.94" N, 0° 22' 52.63" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity |
Country | England |
Main contact forename | Sarah |
Main contact surname | Woodcock |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | Crane Valley Partnership |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
To create, restore and reconnect riverine and wetland habitat (including wet woodland, reedbed, emergent and marginal vegetation, and pond) along the River Crane. Habitat creation and improvement in aquatic and marginal vegetation of the river for water voles, birds, invertebrates and fish.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Yeading Brook Fields/Meadows
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|