Case study:Garratt Park: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Hazel Wilson (talk | contribs) No edit summary |
||
(5 intermediate revisions by one other user not shown) | |||
Line 14: | Line 14: | ||
{{Project overview | {{Project overview | ||
|Status=Planned | |Status=Planned | ||
|Themes=Habitat and biodiversity, Social benefits | |||
|Country=England | |Country=England | ||
|Main contact forename=Valerie | |Main contact forename=Valerie | ||
Line 25: | Line 26: | ||
{{Toggle_button}} | {{Toggle_button}} | ||
{{Toggle_content_start}} | {{Toggle_content_start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Wandle (Croydon to Wandsworth) and the R. Gravney | ||
}} | }} | ||
{{Site | {{Site | ||
|WFD water body code=GB106039023460 | |||
|WFD water body name=Wandle (Croydon to Wandsworth) and the R. Gravney | |||
|Heavily modified water body=No | |||
|Protected species present=No | |||
|WFD water body code= | |Invasive species present=No | ||
|WFD water body name= | |||
|Heavily modified water body= | |||
|Protected species present= | |||
|Invasive species present= | |||
}} | }} | ||
{{Project_background | {{Project_background | ||
Line 158: | Line 109: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
| | |Specific mitigation=Riparian development | ||
|Hydromorphological quality elements=Channel pattern/planform | |||
| | |||
}} | }} | ||
{{Measures | {{Measures | ||
|Bank and bed modifications measure= | |Bank and bed modifications measure=Bank reprofiling, Removing structures | ||
}} | }} | ||
{{Hydromorphological_quality_elements_header}} | {{Hydromorphological_quality_elements_header}} |
Latest revision as of 10:34, 27 October 2015
This case study is pending approval by a RiverWiki administrator.
Location: 51° 26' 2.01" N, 0° 11' 29.87" W
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Valerie |
Main contact surname | Selby |
Main contact user ID | |
Contact organisation | London Borough of Wandsworth |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
Softening of river banks – possible removal of any toe boarding and replacement with softer edges (Garratt Park Allotments). Enhance banks for biodiversity
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Beddington Park, Beddington Park Enhancements, Boulder Pool and Plough Lane, Durand Close, EDF Weir removal, Eel Pass over tilting weir at Ravensbury Park, Hackbridge Restoration, Hackbridge weir notch, King Georges Park, Medland Close, River Wandle... further results
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|