Case study:Knepp Rewilding Project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
{{Project overview
{{Project overview
|Status=Complete
|Status=Complete
|Themes=Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Land use management - forestry
|Project web site url=knepp.co.uk
|Themes=Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Social benefits, Water quality
|Country=England
|Country=England
|Main contact forename=Penny
|Main contact forename=Penny
|Main contact surname=Green
|Main contact surname=Green
|Main contact id=Penny Green
|Contact organisation=Knepp Castle Estate
|Contact organisation=Knepp Castle Estate
|Partner organisations=Environment Agency, Sussex Wildlife Trust,  
|Contact organisation url=knepp.co.uk
|Partner organisations=Environment Agency, Sussex Wildlife Trust, West Sussex County Council and Natural England
|Multi-site=No
|Multi-site=No
|Project picture=View from the tree platform.JPG
|Project picture=View from the tree platform.JPG

Revision as of 15:12, 9 May 2015

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

5.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 58' 40.98" N, 0° 21' 33.26" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://knepp.co.uk
Themes Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Social benefits, Water quality
Country England
Main contact forename Penny
Main contact surname Green
Main contact user ID User:Penny Green
Contact organisation Knepp Castle Estate
Contact organisation web site http://knepp.co.uk
Partner organisations Environment Agency, Sussex Wildlife Trust, West Sussex County Council and Natural England
Parent multi-site project
This is a parent project
encompassing the following
projects
No
View of the river from the tree platform

Project summary

Edit project overview to modify the project summary.


Jointly funded by Natural England and the Knepp Estate, the restoration of the upper reaches of the River Adur lies at the heart of the largest rewilding project in lowland UK.

The work, carried out by the Environment Agency, has involved removing 4 weirs, returning 2.4km of canalised river to its original meanders and linking it to 5.5kms of restored floodplain upstream.

It is part of a landscape-scale conservation enterprise aimed at restoring the full range of hydrological processes from the moment raindrops fall on the land, filtering through vegetation and the soil, to their passage into watercourses towards the sea.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information