|Picture description=The wet woodland will be enhanced
|Picture description=The wet woodland at Ironbridge which will be enhanced
|Project summary=The river restoration at Ironbridge Farm builds on the work undertaken at Little Waltham meadows on the River Chelmer and the nearby Local Nature reserve at Bocking Blackwater.
 
As with all of these works the aim of the project is to improve the water-body under the Water Framework Directive. Currently the River Pant is failing under Water Framework Directive for a number of reasons including diffuse pollution, fish passage, point source and physical modification. It should be noted that this area does suffer from low flows during the summer months, especially if the Abberton scheme which transfers water from the Ouse to Abberton is closed.
 
There are some local issues with the river in this area, that are largely typical of those found elsewhere in Essex. Namely the disconnection of the river from the surrounding floodplain, this has led to a reduction in quality and type of Riparian habitat, in this case but not restricted further afield, wet woodland which is drying out and fen meadows which are decreasing in number and quality. Interestingly and of some note, the site at Ironbridge Farm and the surrounds are a Local Wildlife Site (LoWS) this means they have been recognised as an outstanding site in the context of Essex. Largely the site is notified for its mosaic of habitat but a key element of this is the presence of wet woodland and Fen meadow. So, besides contributing to raising the WFD status of the site, it is also contributing to the rehabilitation of the LoWS in the shape of an enhanced wet woodland and and enhanced Fen meadow.
 
In order to achieve this, a plan has been designed which will increase the seasonal inundation and flooding of the woodland and fen meadow. A simple pipe will be installed which has been set to a level which will not only protect low flows but achieve the desired ecological effects. The level of the pipe is crucial has it must be set to the correct level. This was figured out via a combination of on site measurements and Mannings Equation.
 
 
 
 
 
 
}}
}}
{{Image gallery}}
{{Image gallery}}

Revision as of 15:34, 1 May 2015

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 55' 41.94" N, 0° 31' 6.19" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://www.essexrivershub.co.uk
Themes Habitat and biodiversity, Water quality
Country England
Main contact forename Kieren
Main contact surname Alexander
Main contact user ID User:KierenAlexander
Contact organisation Essex Wildlife Trust
Contact organisation web site http://www.essexwt.org.uk
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The wet woodland at Ironbridge which will be enhanced

Project summary

Edit project overview to modify the project summary.


The river restoration at Ironbridge Farm builds on the work undertaken at Little Waltham meadows on the River Chelmer and the nearby Local Nature reserve at Bocking Blackwater.

As with all of these works the aim of the project is to improve the water-body under the Water Framework Directive. Currently the River Pant is failing under Water Framework Directive for a number of reasons including diffuse pollution, fish passage, point source and physical modification. It should be noted that this area does suffer from low flows during the summer months, especially if the Abberton scheme which transfers water from the Ouse to Abberton is closed.

There are some local issues with the river in this area, that are largely typical of those found elsewhere in Essex. Namely the disconnection of the river from the surrounding floodplain, this has led to a reduction in quality and type of Riparian habitat, in this case but not restricted further afield, wet woodland which is drying out and fen meadows which are decreasing in number and quality. Interestingly and of some note, the site at Ironbridge Farm and the surrounds are a Local Wildlife Site (LoWS) this means they have been recognised as an outstanding site in the context of Essex. Largely the site is notified for its mosaic of habitat but a key element of this is the presence of wet woodland and Fen meadow. So, besides contributing to raising the WFD status of the site, it is also contributing to the rehabilitation of the LoWS in the shape of an enhanced wet woodland and and enhanced Fen meadow.

In order to achieve this, a plan has been designed which will increase the seasonal inundation and flooding of the woodland and fen meadow. A simple pipe will be installed which has been set to a level which will not only protect low flows but achieve the desired ecological effects. The level of the pipe is crucial has it must be set to the correct level. This was figured out via a combination of on site measurements and Mannings Equation.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin Combined Essex

Subcatchment

River name Blackwater Pant
Area category 10 - 100 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 6868 m <br />0.068 km <br />6,800 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105037033860



Other case studies in this subcatchment: Bocking Blackwater River Restoration


Site

Name Ironbridge Farm
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present Yes
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 250250 m <br />0.25 km <br />25,000 cm <br />
Project started 2012/04/01
Works started 2016/08/07
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Essex Wildlife Trust Kieren Alexander
Stakeholder engagement and communication Essex Wildlife Trust Kieren Alexander
Works and works supervision Essex Wildlife Trust Kieren Alexander
Post-project management and maintenance Essex Wildlife Trust Kieren Alexander
Monitoring Essex Wildlife Trust Kieren Alexander



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Structure & condition of riparian/lake shore zones, Channel pattern/planform
Biology Invertebrates, Macrophytes, Fish
Physico-chemical Specific non-synthetic pollutants
Other reasons for the project Habitat creation, Landscape enhancement


Measures

Structural measures
Bank/bed modifications Habitat restoration
Floodplain / River corridor Creation of backwaters, BAP habitat creation, Creation of wetlands, Creation of backwater and ponds
Planform / Channel pattern Introduction of backwaters, Reconnect and restore aquatic habitats
Other
Non-structural measures
Management interventions Ensuring biodiversity, Woodland management, Promoting riparian vegetation
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.essexrivershub.org.uk For more information on this and other projects in Combined Essex catchment

Supplementary Information

Edit Supplementary Information