Case study:River restoration on the River Brett at Shelley: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 71: | Line 71: | ||
|Average channel gradient category=Less than 0.001 | |Average channel gradient category=Less than 0.001 | ||
}} | }} | ||
{{Project background}} | {{Project background | ||
|Reach length directly affected=250 | |||
|Project started=2014/06/01 | |||
|Works started=2014/10/06 | |||
|Works completed=2014/10/10 | |||
|Project completed=2014/11/14 | |||
|Total cost category=1 - 10 k€ | |||
|Investigation and design cost category=Less than 1 k€ | |||
|Investigation and design Lead organisation=Environment Agency | |||
|Investigation and design Other contact forename=Trevor | |||
|Investigation and design Other contact surname=Bond | |||
|Stakeholder1 engagement cost category=Less than 1 k€ | |||
|Stakeholder engagement Lead organisation=Dedham Vale AONB | |||
|Stakeholder engagement Other contact forename=Matt | |||
|Stakeholder engagement Other contact surname=Holden | |||
|Works1 and supervision cost category=1 - 10 k€ | |||
|Works and supervision Lead organisation=Environment Agency | |||
|Works and supervision Other contact forename=Adrian | |||
|Works and supervision Other contact surname=Pearl | |||
}} | |||
{{Motivations}} | {{Motivations}} | ||
{{Measures}} | {{Measures}} | ||
Revision as of 13:34, 24 November 2014
This case study is pending approval by a RiverWiki administrator.
Location: 52° 2' 4.85" N, 0° 57' 32.71" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
| Status | Complete |
|---|---|
| Project web site | |
| Themes | Fisheries, Habitat and biodiversity, Water quality |
| Country | England |
| Main contact forename | Trevor |
| Main contact surname | Bond |
| Main contact user ID | User:Tbond |
| Contact organisation | Environment Agency |
| Contact organisation web site | http://www.gov.uk/government/organisations/environment-agency |
| Partner organisations | Dedham Vale AONB, Suffolk Wildlife Trust |
| Parent multi-site project |
Case_study:Rehabilitation of the River Brett at Shelley, Suffolk |
| This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
A river restoration project driven by a lack of morphological diversity on the River Brett between Layham and Hadleigh. The project involved the transformation of a straight, uniform, steeply embanked, trapezoidal river channel into a morphologically diverse, oxygenated and habitat-rich river channel. Key improvements made to the river here include increased floodplain connectivity, greater variety in channel depth and width and enhanced flow velocities (to accelerate geomorphic change).
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Image gallery
|
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
