Case study:Fresh Wharf: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 156: Line 156:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Floodplain / River corridor=Reedbed creation
   
   
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
     
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}

Revision as of 10:15, 25 April 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 31' 58.61" N, 0° 4' 18.62" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Economic aspects, Habitat and biodiversity, Social benefits
Country England
Main contact forename Becca
Main contact surname O’Shea
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.gov.uk/government/organisations/environment-agency
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Creation of wet reedbed shelves as part of redevelopment. The Roding is sheet piled and urban in nature.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Thames
River basin Roding, Beam and Ingrebourne

Subcatchment

River name Roding (Cripsey Brook to Loxford Water)
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 124124 m <br />0.124 km <br />12,400 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB106037028180



Other case studies in this subcatchment: Chigwell Brook, Land opposite Wanstead Park, River Roding at Ray Lodge Park, Valentines Park, Weir upstream of Redbridge roundabout


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development, Urbanisation
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor Reedbed creation
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information