Case study:River Avon Habitat Enhancement, Fifield: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.25208495977857, -1.7891836166381836 }} {{Project overview |Project title=River Avon Habitat Enhancement, ...") |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology | |Themes=Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology | ||
Line 15: | Line 14: | ||
|Contact organisation url=www.wildtrout.org/ | |Contact organisation url=www.wildtrout.org/ | ||
|Multi-site=No | |Multi-site=No | ||
|Project summary=<b>Background</b><br> | |||
As part of Wiltshire Wildlife Trust's 'Wessex Chalkstream Project' which promotes understanding and conservation on the Hampshire Avon, the Wild Trout Trust led a week of habitat enhancement work on the River Avon at Fifield near Netheravon. | |||
This section of the Avon was once managed by the famous river keeper and author Frank Sawyer. During his time as head keeper for the Services Dry Fly Fishing Association (SDFFA), Frank oversaw the restoration of the river from a polluted, over-silted one, no-longer capable of supporting trout, towards a productive flowing river with a clean gravel bed. Frank's 'Great Clean Up', although not a complete success, led the way for future generations to improve river habitat. | |||
<b>Restoration implemented</b><br> | |||
Volunteers with the support of the Wild Trout Trust, two Wessex Chalkstream Project officers and the local Environment Agency contact, helped to introduce an abundance of woody material into the river, kicking flow about to create a more pronounced thalweg and helping diversify the habitat. By the end of the week, 500 metres of river habitat had been enhanced for £1000 plus the cost of a few chestnut stakes (a bargain at 3 times the price!). | |||
|Lessons learn=One volunteer was a young soldier getting back into physical work after a gruelling 3-year recovery from being seriously wounded in an explosion in Afghanistan. Despite being exhausted, he very much enjoyed the day highlighting the therapeutic value of hands-on conservation work. | |||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} |
Revision as of 14:56, 23 April 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Fisheries, Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Mike |
Main contact surname | Blackmore |
Main contact user ID | |
Contact organisation | Wild Trout Trust |
Contact organisation web site | http://www.wildtrout.org/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Background
As part of Wiltshire Wildlife Trust's 'Wessex Chalkstream Project' which promotes understanding and conservation on the Hampshire Avon, the Wild Trout Trust led a week of habitat enhancement work on the River Avon at Fifield near Netheravon.
This section of the Avon was once managed by the famous river keeper and author Frank Sawyer. During his time as head keeper for the Services Dry Fly Fishing Association (SDFFA), Frank oversaw the restoration of the river from a polluted, over-silted one, no-longer capable of supporting trout, towards a productive flowing river with a clean gravel bed. Frank's 'Great Clean Up', although not a complete success, led the way for future generations to improve river habitat.
Restoration implemented
Volunteers with the support of the Wild Trout Trust, two Wessex Chalkstream Project officers and the local Environment Agency contact, helped to introduce an abundance of woody material into the river, kicking flow about to create a more pronounced thalweg and helping diversify the habitat. By the end of the week, 500 metres of river habitat had been enhanced for £1000 plus the cost of a few chestnut stakes (a bargain at 3 times the price!).
Monitoring surveys and results
Lessons learnt
One volunteer was a young soldier getting back into physical work after a gruelling 3-year recovery from being seriously wounded in an explosion in Afghanistan. Despite being exhausted, he very much enjoyed the day highlighting the therapeutic value of hands-on conservation work.
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|