Case study:Greenwich Peninsula: Difference between revisions
No edit summary |
Mattleeson (talk | contribs) No edit summary |
||
Line 29: | Line 29: | ||
• Surface water flood risk reduction on each plot will be provided in line with the London Plan policies. | • Surface water flood risk reduction on each plot will be provided in line with the London Plan policies. | ||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment | ||
|Subcatchment=Thames | |||
}} | |||
{{Site | {{Site | ||
|Name=Greenwich Peninsula | |Name=Greenwich Peninsula |
Revision as of 15:58, 29 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Spatial planning |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Greenwich Peninsula Regeneration Ltd |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
prior to 2000 1.7km of flood defences were replaced and refurbished on the eastern side of the peninsula A further 700m proposed on the western frontage.
Greenwich Peninsula is a 190 acre development site and is therefore London’s largest regeneration scheme. The mixed use development consists of 10,000 new homes, 3.5 million square feet of office space – a brand new business district for London, with over 150 shops and restaurants. The site is being developed in phases/plots in line with the overall masterplan produced by Terry Farrell and Partners. Many of the features incorporated at this site are being used as good practice with other developers across London.
• The intertidal terraces provide valuable habitat for fish and other animals and birds, as well as creating a new landscape feature for people to enjoy. • Flood defences designed to protect from tidal flooding with an allowance made for the future effects of climate change. • Surface water flood risk reduction on each plot will be provided in line with the London Plan policies.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Thames |
---|---|
River basin | thames |
Subcatchment
River name | Thames (Kemble to Waterhay Bridge) |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | |
Dominant land cover | |
Waterbody ID |
Site
Name | Greenwich Peninsula |
---|---|
WFD water body codes | GB530603911402 |
WFD (national) typology | intertidal |
WFD water body name | THAMES MIDDLE |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | Estuary |
Dominant substrate | Estuarine mud |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 24002,400 m <br />2.4 km <br />240,000 cm <br /> |
---|---|
Project started | 1997/01/01 |
Works started | 1997/01/01 |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bank improvement, creation of intertidal terraces |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information
The site
• Tidal range 7m.
• Over 1300m of sheet piling was in poor condition and needed to be replaced.
• Peninsula being redeveloped for high-density, high-value housing and facilities.
What the developers did
• In all locations, the existing sheet pile wall was cut down to near beach level and capped.
• Approximately 7–15m inland, either sheet pile or an L-shaped concrete wall were installed.
• Site 1: infill material was installed over wide area at stable angle of repose and allowed to colonise naturally.
• Sites 2 and 3: terraces were created between the new wall and the foreshore using gabions and wooden piles, maximising the area between Mean High Water Neap and Mean High Water Spring tide levels wherever possible at slopes of 1:7 or less. Growing medium initially protected under coir matting.
• Sites 2 and 3 were planted with a variety of saltmarsh plants through coir matting. Substrate particle size distribution was a close match to foreshore for both stability in local area and habitat value. Eastern wall, Greenwich Peninsula, London: Site 2 during construction
The result
• Wave action led to lifting of the matting and extraction of many young plants, necessitating some replanting, though there was also considerable natural colonisation.
• Re-planting of Sites 2 and 3 directly into substrate without erosion matting was most successful with Common Reed, Grey Club-rush Sea Club-rush and Sea Aster, several species surviving well below or above the main ‘saltmarsh zone’.
• Failure to install rhizome breaks has led to excessive dominance by Common Reed, which may need to be corrected.
• Freshwater outfall locations became areas bare of much vegetation, and reinforced geotextile mat used at these locations eventually looked unsightly.
• Extensive monitoring has shown intense use of the terraces by Sea Bass and other species.
• Flounder and adult Common Goby did not appear to ascend submerged terrace steps. One solution to this is shown in the design for the terracing at Site 3, where a series of terraces sloping in three dimensions was created in the form of an ‘ecological sculpture’. (In future schemes, cutting down of the old sheet pile to beach level should be considered to avoid the creation of barriers to certain fish species).
• Limited scope for human access, which might be addressed in future schemes by a variety of slipways or floating pontoons (where ecological and safety constraints permit).
• Overall considered to be a highly successful, benchmark design, though a few gabions appear to be breaking down after ten years (probably due to use of welded gabions) and repairs/renewals may be necessary to retain certain terraces (woven and plastic-coated gabions are always the preferred option if gabions are to be used).