Case study:Bury Lodge Wetlands: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 14: Line 14:
{{Project overview
{{Project overview
|Status=Planned
|Status=Planned
|Themes=Flood risk management
|Themes=Flood risk management, Habitat and biodiversity
|Country=England
|Country=England
|Main contact forename=Graham
|Main contact forename=Graham

Revision as of 16:33, 9 April 2014

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 50° 57' 14.70" N, 0° 10' 52.73" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Planned
Project web site
Themes Flood risk management, Habitat and biodiversity
Country England
Main contact forename Graham
Main contact surname Campbell
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations Local Schools, Environment Agency, London Borough of Enfield
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


It is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. The site could accommodate up to 10,000m (cubic) of flood waters. The use of reeds and other aquatic plant species would serve to improve water quality in Salmons Brook by filtering out sediments and absorbing nutrients. Thus at the same time providing an area of educational interest and recreation by sensitively landscaping the area into an ecologically interesting site with habitat creation. Allowing use by a neighbouring school and as a safe linkage between two neighbouring communities as part of the creation of a green transport link along Salmons Brook from Little Bury Street right through to Edmonton Green. • Reduction in flood risk to properties in Edmonton Green area downstream
• Enhanced wildlife habitat in the park and along the river corridor
• Creation of a new resource for the local community
• Improved water quality to Salmons Brook
• Provision footpath/cycleway along river would improve green transport links across the borough

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 410 m0.41 km <br />41,000 cm <br />
Project started 2009/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information