|Project summary=It is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. The site could accommodate up to 10,000m (cubic) of flood waters. The use of reeds and other aquatic plant species would serve to improve water quality in Salmons Brook by filtering out sediments and absorbing nutrients. Thus at the same time providing an area of educational interest and recreation by sensitively landscaping the area into an ecologically interesting site with habitat creation. Allowing use by a neighbouring school and as a safe linkage between two neighbouring communities as part of the creation of a green transport link along Salmons Brook from Little Bury Street right through to Edmonton Green. • Reduction in flood risk to properties in Edmonton Green area downstream<br>• Enhanced wildlife habitat in the park and along the river corridor<br>• Creation of a new resource for the local community<br>• Improved water quality to Salmons Brook<br>• Provision footpath/cycleway along river would improve green transport links across the borough | |Project summary=It is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. The site could accommodate up to 10,000m (cubic) of flood waters. The use of reeds and other aquatic plant species would serve to improve water quality in Salmons Brook by filtering out sediments and absorbing nutrients. Thus at the same time providing an area of educational interest and recreation by sensitively landscaping the area into an ecologically interesting site with habitat creation. Allowing use by a neighbouring school and as a safe linkage between two neighbouring communities as part of the creation of a green transport link along Salmons Brook from Little Bury Street right through to Edmonton Green. • Reduction in flood risk to properties in Edmonton Green area downstream<br>• Enhanced wildlife habitat in the park and along the river corridor<br>• Creation of a new resource for the local community<br>• Improved water quality to Salmons Brook<br>• Provision footpath/cycleway along river would improve green transport links across the borough |
Revision as of 14:05, 9 April 2014
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | |
Country | England |
Main contact forename | Graham |
Main contact surname | Campbell |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
It is proposed to create a flood storage area incorporating a wetland nature reserve, possibly involving the re-alignment of Salmons Brook. The site could accommodate up to 10,000m (cubic) of flood waters. The use of reeds and other aquatic plant species would serve to improve water quality in Salmons Brook by filtering out sediments and absorbing nutrients. Thus at the same time providing an area of educational interest and recreation by sensitively landscaping the area into an ecologically interesting site with habitat creation. Allowing use by a neighbouring school and as a safe linkage between two neighbouring communities as part of the creation of a green transport link along Salmons Brook from Little Bury Street right through to Edmonton Green. • Reduction in flood risk to properties in Edmonton Green area downstream
• Enhanced wildlife habitat in the park and along the river corridor
• Creation of a new resource for the local community
• Improved water quality to Salmons Brook
• Provision footpath/cycleway along river would improve green transport links across the borough
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|