Case study:Sutcliffe Park: Difference between revisions
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Flood risk management, Habitat and biodiversity | |Themes=Flood risk management, Habitat and biodiversity | ||
Line 14: | Line 13: | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.environment-agency.gov.uk | |Contact organisation url=www.environment-agency.gov.uk | ||
|Name of parent multi-site project=Case_study:Quaggy Flood Alleviation Scheme | |||
|Multi-site=No | |Multi-site=No | ||
| | |Project summary=Before the restoration project, the Quaggy at Sutcliffe Park was a forgotten river. It flowed underground through a concrete channel, unnoticed and providing little habitat for wildlife. | ||
By bringing the Quaggy out of its culvert, a meandering river has been reborn. Now, the river can overflow into the park using it as a flood storage area. | |||
And at other times, the park is there for local communities to enjoy. A network of pathways and viewing points criss-cross the park. Within the wetland areas, there are wooden boardwalks making the area more accessible for prams and wheelchairs. It is a habitat for a huge variety of plants and animals, and features wildflower meadows, wetland areas, reed beds, lakes and ponds. | |||
The river is now a place where wildlife can thrive - from emperor dragonflies and wetland birds, to amphibians and butterflies. Several protected species have now made it their home, including the reed warbler and little grebe. The park has quickly become an important area of natural beauty and a recreational site for the local community. | |||
It’s making a major contribution to the quality of life for local residents. Natural environments encourage regular physical activity, reduce the risk of serious diseases and improve mental well-being. | |||
Surveys have shown that park visits have increased significantly. And people who used the park before, are | |||
now staying longer. One in four only started visiting the park after the improvements. | |||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} |
Revision as of 11:17, 23 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Before the restoration project, the Quaggy at Sutcliffe Park was a forgotten river. It flowed underground through a concrete channel, unnoticed and providing little habitat for wildlife.
By bringing the Quaggy out of its culvert, a meandering river has been reborn. Now, the river can overflow into the park using it as a flood storage area.
And at other times, the park is there for local communities to enjoy. A network of pathways and viewing points criss-cross the park. Within the wetland areas, there are wooden boardwalks making the area more accessible for prams and wheelchairs. It is a habitat for a huge variety of plants and animals, and features wildflower meadows, wetland areas, reed beds, lakes and ponds.
The river is now a place where wildlife can thrive - from emperor dragonflies and wetland birds, to amphibians and butterflies. Several protected species have now made it their home, including the reed warbler and little grebe. The park has quickly become an important area of natural beauty and a recreational site for the local community.
It’s making a major contribution to the quality of life for local residents. Natural environments encourage regular physical activity, reduce the risk of serious diseases and improve mental well-being.
Surveys have shown that park visits have increased significantly. And people who used the park before, are now staying longer. One in four only started visiting the park after the improvements.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Sutcliffe Park |
---|---|
WFD water body codes | GB106039023290 |
WFD (national) typology | Calcareous |
WFD water body name | Quaggy |
Pre-project morphology | Closed culvert |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Channel pattern/planform | Yes | Yes | No | No | No |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish | Yes | Yes | No | Yes | No | |
Invertebrates | Yes | Yes | No | Yes | No | |
Macrophytes | Yes | No | No | No | No |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Nutrient concentrations | Yes | Yes | No | No | No |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
stakeholder liaison | Yes | Yes | No | No | No | |
health benefits | No | Yes | No | No | No | Improvement |
economic benefits | No | Yes | No | No | No | Inconclusive |
River Corridor Survey | Yes | Yes | No | No | No | |
Bat Survey | Yes | No | No | No | No | |
Mammel survey | Yes | No | No | No | No | |
birds | Yes | No | No | No | No |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information
construction The works were designed to alleviate flooding in the Lewisham area. The flood detention area was constructed on the Quaggy River. The location of the detention area is approximately 3km east of Lewisham, in the London Borough of Greenwich, in Sutcliffe Park, formerly eight football pitches. The construction includes a 2.5m high x 480m long earth embankment, which surrounds Sutcliffe Park. The embankment is 2.5m high at its highest point to the west side of the site and at existing ground level to the east. The embankment retains floodwaters within the reservoir basin that has been excavated. The culvert carrying the river follows two sides of the park and is to remain. The low flow inlet control structure was formed through cutting slots into the side of the culvert and a reinforced concrete channel to direct the flow into the park. A few metres downstream of the low flow inlet is a 0.5m high weir to direct the majority of the flow through the park.
The high flow inlet also has slots cut into the side of the culvert and a concrete slab in front to prevent erosion. Just downstream of the high flow inlet a flume has been constructed within the culvert to constrict the flow. The spillway also has slots in the side of the culvert and the landform is at a lower level to allow the water back into the culvert at this location. The outlet structure is constructed from reinforced concrete and has a plastic pipe connecting the flow from the park back into the culvert. The low flow inlet and outlet structures have penstocks within them to control the water movements.