Case study:Quaggy Flood Alleviation Scheme: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 50: Line 50:
|File name=A River Reborn - Quaggy.pdf
|File name=A River Reborn - Quaggy.pdf
|Description=Restoring the River Quaggy and tackling flooding
|Description=Restoring the River Quaggy and tackling flooding
}}
{{Case study documents
|File name=Quaggy FAS General Information, 28 May 08.pdf
|Description=General Information
}}
}}
{{Additional Documents end}}
{{Additional Documents end}}

Revision as of 11:02, 23 August 2012

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

3.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 27' 20.99" N, 0° 1' 40.99" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Flood risk management
Country England
Main contact forename Toni
Main contact surname Scarr
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.environment-agency.gov.uk
Partner organisations
This is a parent project
encompassing the following
projects
Manor Park, Quaggy channel improvements, Sutcliffe Park
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment



Site

Edit site
Name River Quaggy
WFD water body codes GB106039023290
WFD (national) typology Calcareous
WFD water body name Quaggy
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present Yes
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 43004,300 m <br />4.3 km <br />430,000 cm <br />
Project started
Works started
Works completed
Project completed
Total cost category more than 10000 k€
Total cost (k€) 18,00018,000 k€ <br />18,000,000 € <br />
Benefit to cost ratio
Funding sources Environment Agency

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents

Restoring the River Quaggy and tackling flooding

General Information


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information