Case study:Barking Creek near A13: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.52804712139871, 0.08050616862794868 }} {{Project overview |Project title=Baking Creek near A13 |Status=Co...") |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Themes=Habitat and biodiversity, Social benefits | |Themes=Habitat and biodiversity, Social benefits | ||
Line 12: | Line 11: | ||
|Main contact forename=Toni | |Main contact forename=Toni | ||
|Main contact surname=Scarr | |Main contact surname=Scarr | ||
|Main contact id=Ascarr | |||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.environment-agency.gov.uk | |Contact organisation url=www.environment-agency.gov.uk | ||
|Name of parent multi-site project=Case_study:Lower River Roding Regeneration Project | |||
|Multi-site=No | |Multi-site=No | ||
| | |Project picture=A13.jpg | ||
|Picture description=during construction | |||
|Project summary='''Previous site use/issues''' | |||
• Terrestrial habitat with rank grassland and species poor scrubland. | |||
• Plot of adjacent to Barking Creek, accessible by informal and underused riverside footpath. | |||
• Blind spots within site (formed by sections of redundant fencing) lead to a raised ‘fear of crime’. | |||
• Riverside footpath not suitable for wheelchairs. | |||
• Concrete flood defence in poor condition needing replacing. | |||
'''Enhancements''' | |||
• Retreat and renewal of flood defences adapting to climate change by creating increased flood storage capacity and improved riverside and intertidal habitat. Reed bunting and sand martins have been seen in this area. | |||
• Sand martin nesting tubes. | |||
• Improved footpath, suitable for wheelchairs. | |||
• Blind spots remove and the site opened up although reeds allowed establish to help protect the wildlife on the river. | |||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} |
Revision as of 19:40, 22 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | User:Ascarr |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Previous site use/issues
• Terrestrial habitat with rank grassland and species poor scrubland.
• Plot of adjacent to Barking Creek, accessible by informal and underused riverside footpath.
• Blind spots within site (formed by sections of redundant fencing) lead to a raised ‘fear of crime’.
• Riverside footpath not suitable for wheelchairs.
• Concrete flood defence in poor condition needing replacing.
Enhancements
• Retreat and renewal of flood defences adapting to climate change by creating increased flood storage capacity and improved riverside and intertidal habitat. Reed bunting and sand martins have been seen in this area.
• Sand martin nesting tubes.
• Improved footpath, suitable for wheelchairs.
• Blind spots remove and the site opened up although reeds allowed establish to help protect the wildlife on the river.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information