Case study:Greenwich Peninsula: Difference between revisions
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.environment-agency.gov.uk | |Contact organisation url=www.environment-agency.gov.uk | ||
|Partner organisations=Greenwich Peninsula Regeneration Ltd | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Greenwich.jpg | |Project picture=Greenwich.jpg | ||
|Picture description=Tidal terraces | |Picture description=Tidal terraces | ||
|Project summary=prior to 2000 1.7km of flood defences were replaced and refurbished on the eastern side of the peninsula | |Project summary=prior to 2000 1.7km of flood defences were replaced and refurbished on the eastern side of the peninsula A further 700m proposed on the western frontage. | ||
Greenwich Peninsula is a 190 acre development site and is therefore London’s largest regeneration scheme. | |||
The mixed use development consists of 10,000 new homes, 3.5 million square feet of office space – a brand new business district for London, with over 150 shops and restaurants. | |||
The site is being developed in phases/plots in line with the overall masterplan produced by Terry Farrell and Partners. | |||
Many of the features incorporated at this site are being used as good practice with other developers across London. | |||
• The intertidal terraces provide valuable habitat for fish | • The intertidal terraces provide valuable habitat for fish |
Revision as of 19:05, 22 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Spatial planning |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Greenwich Peninsula Regeneration Ltd |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
prior to 2000 1.7km of flood defences were replaced and refurbished on the eastern side of the peninsula A further 700m proposed on the western frontage.
Greenwich Peninsula is a 190 acre development site and is therefore London’s largest regeneration scheme. The mixed use development consists of 10,000 new homes, 3.5 million square feet of office space – a brand new business district for London, with over 150 shops and restaurants. The site is being developed in phases/plots in line with the overall masterplan produced by Terry Farrell and Partners. Many of the features incorporated at this site are being used as good practice with other developers across London.
• The intertidal terraces provide valuable habitat for fish and other animals and birds, as well as creating a new landscape feature for people to enjoy. • Flood defences designed to protect from tidal flooding with an allowance made for the future effects of climate change. • Surface water flood risk reduction on each plot will be provided in line with the London Plan policies.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Greenwich Peninsula |
---|---|
WFD water body codes | GB530603911402 |
WFD (national) typology | intertidal |
WFD water body name | THAMES MIDDLE |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | Estuary |
Dominant substrate | Estuarine mud |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 24002,400 m <br />2.4 km <br />240,000 cm <br /> |
---|---|
Project started | 1998/01/01 |
Works started | 1999/01/01 |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bank improvement, creation of intertidal terraces |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information