Case study:Greenwich Peninsula: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 67: | Line 67: | ||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=thamescasestudies.pdf | |||
|Description=Good Practice case study no 4 | |||
}} | |||
{{Case study documents | {{Case study documents | ||
|File name=Estuary Edges structurally engineered designs.pdf | |File name=Estuary Edges structurally engineered designs.pdf | ||
|Description=Design Guidance includign Greenwich as an example | |Description=Design Guidance includign Greenwich as an example | ||
}} | }} | ||
{{Additional Documents end}} | {{Additional Documents end}} |
Revision as of 18:54, 22 August 2012
This case study is pending approval by a RiverWiki administrator.
Location: 51° 30' 11.64" N, 0° 0' 10.92" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Spatial planning |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Edit project overview to modify the project summary.
prior to 2000 1.7km of flood defences were replaced and refurbished on the eastern side of the peninsula
A further 700m proposed on the western frontage.
• The intertidal terraces provide valuable habitat for fish and other animals and birds, as well as creating a new landscape feature for people to enjoy. • Flood defences designed to protect from tidal flooding with an allowance made for the future effects of climate change. • Surface water flood risk reduction on each plot will be provided in line with the London Plan policies.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Site
Name | Greenwich Penisula |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | THAMES MIDDLE |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | Estuary |
Dominant substrate | Estuarine mud |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 24002,400 m <br />2.4 km <br />240,000 cm <br /> |
---|---|
Project started | 1998/01/01 |
Works started | 1999/01/01 |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Bank improvement, creation of intertidal terraces |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information