Case study:River Avon at East Chisenbury: Difference between revisions
No edit summary |
No edit summary |
||
Line 38: | Line 38: | ||
{{Toggle button}} | {{Toggle button}} | ||
{{Toggle content start}} | {{Toggle content start}} | ||
{{ | {{Case study subcatchment | ||
|Subcatchment= | |Subcatchment=Hampshire Avon (Upper) | ||
}} | }} | ||
{{Site | {{Site |
Revision as of 08:53, 15 October 2013
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Monitoring, Social benefits, Spatial planning |
Country | England |
Main contact forename | John |
Main contact surname | Rattray |
Main contact user ID | |
Contact organisation | Wessex Chalkstreams Project |
Contact organisation web site | http://www.wiltshirewildlife.org/what-we-do/wessexchalksstreams |
Partner organisations | Wiltshire Chalk Streams, Environment Agency, Wessex Water, Natural England, Wiltshire Wildlife Trust, Chisenbury Fishing Syndicate, Cain Bio-Engineering Ltd |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The River Avon and its major tributaries are recognised as a Special Area of Conservation for their rare habitats and species, including flowing water vegetation (eg. ranunculus and water-crowfoot), Atlantic salmon, Bullhead, brook and sea lamprey, water vole and otter.
The restoration project at East Chisenbury is part of the Wessex Chalk Streams PRoject (WCSP), which began in 1999 - a partnership between the Wiltshire Wildlife Trust, Natural England, the Environment Agency, Wessex Water and the Wiltshire Fishery Association. the project is focused on restoring river and wetland habitat, while helping to achieve targets under the Wiltshire & Swindon and Wessex Water Biodiversity Action Plans (BAPs).
The project at East Chisenbury was completed in two phases:
- Phase 1 (2005): Trial project to restore a 70m reach below Compton Bridge which had been subject to heavy dredging - Total Cost: £30,000.
- Phase 2 (2009): Restoration of a 650m reach upstream of Compton Bridge. Involved use of successful 'coir net' technique to re-introduce sinuosity and hydromorphological function to the overwide channel.
- Further information regarding aims, objectives, project successes and pre/post restoration project photos are available in the attached Wessex Chalk Streams Project report (see bottom of page).
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Gunville Phase I, Longstreet A 91a, River Avon Habitat Enhancement, Fifield, West Amesbury
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|