Case study:Rams Brewery: Difference between revisions
(Created page with "{{Case study status |Approval status=Draft }} {{Location |Location=51.45732314574653, -0.19362625057067362 }} {{Project overview |Project title=Rams Brewery |Status=In progres...") |
No edit summary |
||
Line 6: | Line 6: | ||
}} | }} | ||
{{Project overview | {{Project overview | ||
|Status=In progress | |Status=In progress | ||
|Themes=Spatial planning | |Themes=Spatial planning | ||
Line 14: | Line 13: | ||
|Contact organisation=Environment Agency | |Contact organisation=Environment Agency | ||
|Contact organisation url=www.environment-agency.gov.uk | |Contact organisation url=www.environment-agency.gov.uk | ||
|Partner organisations=Minerva Plc | |||
|Multi-site=No | |Multi-site=No | ||
|Project picture=Rams brewery.jpg | |||
|Picture description=A graphic of the proposed scheme | |||
|Project summary=The Ram Brewery Site is located in Wandsworth Town Centre and comprises the former Youngs Brewery which for over 150 years has been a familiar local landmark for both Wandsworth residents and visitors. The site is divided by the River Wandle which runs south to north and joins the River Thames 500m to the north. | |||
The scheme proposes opening up the site to the public for the first time in its history and provides 1.02ha of high quality public realm, including two public open squares, each framed by the refurbished listed brewery buildings and riverside walkways. | |||
In addition, the development will provide 1,036 residential units in the form of two towers and space for a mix of uses including office, retail, leisure units and a microbrewery. | |||
}} | }} | ||
{{Case study subcatchment}} | {{Case study subcatchment}} |
Revision as of 18:04, 22 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Spatial planning |
Country | England |
Main contact forename | James |
Main contact surname | Togher |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | Minerva Plc |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Ram Brewery Site is located in Wandsworth Town Centre and comprises the former Youngs Brewery which for over 150 years has been a familiar local landmark for both Wandsworth residents and visitors. The site is divided by the River Wandle which runs south to north and joins the River Thames 500m to the north.
The scheme proposes opening up the site to the public for the first time in its history and provides 1.02ha of high quality public realm, including two public open squares, each framed by the refurbished listed brewery buildings and riverside walkways. In addition, the development will provide 1,036 residential units in the form of two towers and space for a mix of uses including office, retail, leisure units and a microbrewery.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information