Case study:Kirkstall Valley Weir Fish Passes Project: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 15: Line 15:
The weirs are both situated on the left side channel (looking downstream) of Kirkstall Island. There are two weirs on the right side channel but careful consideration has led to the belief that fish will use the left side where the heavier flow is located.
The weirs are both situated on the left side channel (looking downstream) of Kirkstall Island. There are two weirs on the right side channel but careful consideration has led to the belief that fish will use the left side where the heavier flow is located.
}}
}}
{{Image gallery}}
{{Case study image
|File name=The map of the area.JPG
|Caption=Map of the area
}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment
{{Case study subcatchment
|Subcatchment=Aire, Calder
|Subcatchment=Aire, Calder
Line 39: Line 47:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Case study image
|File name=The map of the area.JPG
|Caption=Map of the area
}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Additional Documents end}}
{{Additional Documents end}}
Line 50: Line 52:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Revision as of 10:58, 6 September 2013

3.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity
Country England
Main contact forename Kevin
Main contact surname Sunderland
Main contact user ID
Contact organisation Leeds City Council
Contact organisation web site
Partner organisations Envi-ronment Agency, Canoe England, Aire Action Leeds and the West Yorkshire CARP Group
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The outcome of the project is the improvement for fish passage around Kirkstall Island on the River Aire in Leeds by provision of fish passes at St Ann's Mills weir and Burley Mills weir.The fish passes will also benefit the other species which already inhabit the river but are prevented from reaching optimal spawning and feeding grounds. The weirs are both situated on the left side channel (looking downstream) of Kirkstall Island. There are two weirs on the right side channel but careful consideration has led to the belief that fish will use the left side where the heavier flow is located.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Map of the area
ShowHideAdditionalImage.png


Catchment and subcatchment

Subcatchment:Aire, Calder


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category 500 - 1000 k€
Total cost (k€) 700.850700.85 k€ <br />700,850 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Fish: Species composition
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor The construction of two fish passes
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information