Case study:River Dart (Totnes) hydropower: Difference between revisions
No edit summary |
No edit summary |
||
Line 18: | Line 18: | ||
The project cost is estimated to be in the region of £1 million. | The project cost is estimated to be in the region of £1 million. | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=Doc1.pdf | |||
|Caption=Design plans | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=Dart | |Subcatchment=Dart | ||
Line 53: | Line 61: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
Line 67: | Line 70: | ||
MannPower Consulting Ltd (2011. Hydropower installation at Totnes project proposal. MannPower Consulting:York. | MannPower Consulting Ltd (2011. Hydropower installation at Totnes project proposal. MannPower Consulting:York. | ||
}} | }} | ||
{{Toggle content end}} |
Revision as of 10:56, 6 September 2013
Project overview
Status | Planned |
---|---|
Project web site | |
Themes | Hydropower |
Country | England |
Main contact forename | Nick |
Main contact surname | Elbourne |
Main contact user ID | |
Contact organisation | River Restoration Centre |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Totnes broad and long weir historically directed flow into a mill leat. At the northern end of the weir a pool-and-transverse type fish pass is currently in a state of disrepair and is supplied with an excessive flow rate to facilitate fish movement.
A proposal is currently being considered to install a hydropower scheme on part of the existing weir structure comprising a pair of Archimedean screw turbines. The scheme would also encompass an additional Larinier type fish pass, alongside the repair of the existing pool-and-traverse fish pass. Underwater cameras and a fish counter would estimate Salmon and Trout migration to spawning grounds in the Upper Dart. The weir itself currently has an uneven crest which would be repaired by installing a plate to the crest to improve the direct flow of water over the weir.
The electrical generation will be used by the King Edward VI Community College, which is one of the largest schools in Devon. A small classroom complex is proposed for the site next to the weir to be used by a KEVICC educational trust.
The project cost is estimated to be in the region of £1 million.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information references: MannPower Consulting Ltd (2011. Hydropower installation at Totnes project proposal. MannPower Consulting:York.
|