Case study:River Alt at Knowsley: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 24: Line 24:
Anecdotal evidence suggests that people are happy with the scheme. Knowsley MBC is undertaking further works to open up the riparian corridor and is currently installing a cycle path.
Anecdotal evidence suggests that people are happy with the scheme. Knowsley MBC is undertaking further works to open up the riparian corridor and is currently installing a cycle path.
}}
}}
{{Image gallery}}
{{Case study image
|File name=Prior to works.jpg
|Caption=River Alt prior to works
}}
{{Case study image
|File name=Vegetated channel.jpg
|Caption=Vegetated channel threads
}}
{{Case study image
|File name=Vegetation structure.jpg
|Caption=Diverse vegetation structure
}}
{{Case study image
|File name=Excavated flooplain area.jpg
|Caption=Newly excavated floodplain area
}}
{{Case study image
|File name=2012Nov23 Woolfall H Reedbed area cropped.jpg
|Caption=Floodplain area - 2012
}}
{{Case study image
|File name=March 2012 comparative photo.JPG
|Caption=One of choked braided side channels - 2012
}}
{{Case study image
|File name=Sept 2012.jpg
|Caption=Issues with urban litter evident - 2012
}}
{{Image gallery end}}
{{Toggle button}}
{{Toggle content start}}
{{Case study subcatchment}}
{{Case study subcatchment}}
{{Site
{{Site
Line 93: Line 125:
{{Monitoring documents}}
{{Monitoring documents}}
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
 
{{Case study image
|File name=Prior to works.jpg
|Caption=River Alt prior to works
}}
{{Case study image
|File name=Vegetated channel.jpg
|Caption=Vegetated channel threads
}}
{{Case study image
|File name=Vegetation structure.jpg
|Caption=Diverse vegetation structure
}}
{{Case study image
|File name=Excavated flooplain area.jpg
|Caption=Newly excavated floodplain area
}}
{{Case study image
|File name=2012Nov23 Woolfall H Reedbed area cropped.jpg
|Caption=Floodplain area - 2012
}}
{{Case study image
|File name=March 2012 comparative photo.JPG
|Caption=One of choked braided side channels - 2012
}}
{{Case study image
|File name=Sept 2012.jpg
|Caption=Issues with urban litter evident - 2012
}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}
{{Additional Documents end}}
{{Additional Documents end}}
Line 132: Line 135:
{{Additional links and references footer}}
{{Additional links and references footer}}
{{Supplementary Information}}
{{Supplementary Information}}
{{Toggle content end}}

Revision as of 09:51, 6 September 2013

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 25' 39.05" N, 2° 51' 16.79" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Flood risk management, Habitat and biodiversity, Water quality
Country England
Main contact forename Sue
Main contact surname Slamon
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site http://www.environment-agency.gov.uk/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Cross section of new floodplain and braided channels

Project summary

Edit project overview to modify the project summary.


The Alt is a small, low energy urban river which had been historically re-sectioned, straightened and over deepened. The river flows beside a road and was constrained within a trapezoidal channel. Improved water quality had seen fish return to parts of the river but further improvements to the riverine habitat were desired. Consultation with local authorities, community groups and local schools took place during the design and construction phases. Options were limited by planning permissions on parts of the site and the existence of a wildflower meadow. Improving public access to the river was a very important element of the scheme. The 1.5m, 30 degree banks were excavated back on either side of the existing course and up to 30m width of 'floodplain' was created. This comprises a mix of a main and braided channels separated by marginal berms. The new course was approximately 25% larger and deeper than the braided channels to encourage the majority of low flows along this route. Initial earthworks have delivered access and recreation improvements along this stretch of the Alt. Reedbed habitat has established reinstating a locally rare habitat. However, this has also has some negative impacts in that biodiversity has been limited by reedbed monoculture and encroachment of the reedbed has reduced velocities increasing siltation and reducing flow variation as a result. Minimal management has been undertaken since the project work and as a result the site has become overgrown with vegetation and some of the braided side channels have become choked. Tree work is underway as is work to re-open the braided channels (part of Knowsley 2020 Project). The project would have benefited from a tailored long term management plan. Water quality appears to have improved with the number and density of pollution sensitive invertebrates increasing since the works were carried out. Anecdotal evidence suggests that people are happy with the scheme. Knowsley MBC is undertaking further works to open up the riparian corridor and is currently installing a cycle path.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


River Alt prior to works
Vegetated channel threads
Diverse vegetation structure
Newly excavated floodplain area
Floodplain area - 2012
One of choked braided side channels - 2012
Issues with urban litter evident - 2012
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name River Alt, Knowsley
WFD water body codes GB112069060580
WFD (national) typology
WFD water body name
Pre-project morphology Artificial channel, Straightened, Over-widened, resectioned
Reference morphology Braided
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate Clay
River corridor land use Urban
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 140140 m <br />0.14 km <br />14,000 cm <br />
Project started 2006/02/01
Works started
Works completed
Project completed 2006/10/01
Total cost category 10 - 50 k€
Total cost (k€) 46.346.3 k€ <br />46,300 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Biodiversity
Physico-chemical Water Quality
Other reasons for the project Improving public access


Measures

Structural measures
Bank/bed modifications Lowering of embankments
Floodplain / River corridor Floodplain re-connection
Planform / Channel pattern Creation of braided channel, Allow future natural channel changes to occur
Other Planting of riparian zone
Non-structural measures
Management interventions Tree management works and re-opening of choked side channels is planned as part of 'Knowsley 2020' project. The site would have benefited from a long term tailored management plan.
Social measures (incl. engagement) Improving public access to the river was an important component of the scheme
Other Consultation with local authorities, community groups and local schools took place during the design and construction phases


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Invertebrates No Yes No Yes No Improvement

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Yes Yes No No No Improvement

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Public perceptions No Yes Yes No No Awaiting results


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.therrc.co.uk/pdf/manual/MAN 3 4.pdf RRC Manual of River Restoration Techniques entry

Supplementary Information

Edit Supplementary Information