Case study:Clayton Vale: Difference between revisions
No edit summary |
No edit summary |
||
Line 21: | Line 21: | ||
}} | }} | ||
{{Image gallery}} | |||
{{Case study image | |||
|File name=River Medlock weir Clayton Vale.png | |||
|Caption=Weir prior to works | |||
}} | |||
{{Image gallery end}} | |||
{{Toggle button}} | |||
{{Toggle content start}} | |||
{{Case study subcatchment | {{Case study subcatchment | ||
|Subcatchment=River Medlock | |Subcatchment=River Medlock | ||
Line 38: | Line 46: | ||
{{Monitoring documents}} | {{Monitoring documents}} | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Additional Documents end}} | {{Additional Documents end}} | ||
Line 49: | Line 51: | ||
{{Additional links and references footer}} | {{Additional links and references footer}} | ||
{{Supplementary Information}} | {{Supplementary Information}} | ||
{{Toggle content end}} |
Revision as of 08:40, 6 September 2013
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Hydromorphology |
Country | England |
Main contact forename | Oliver |
Main contact surname | Southgate |
Main contact user ID | |
Contact organisation | Environment Agency |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Manchester City Council identified that the Clayton Vale portion of the study area (east of Bank Bridge Road) was occupied by a historical landfill site, which was used for the disposal of ash cinders from the Stuart Street Power Station and as a municipal landfill. Consultants Atkins are in the process of undertaking ground investigations to determine leachate, groundwater and soil contamination including waste characterisation testing to determine the status of these materials and to allow an effective remediation strategy to be developed for the any river channel/corridor restoration works and to prevent the creation of new pollutant linkages or the exacerbation of existing ones, in upstream demonstration area.
It will be a huge achievement if we can restore this most heavily degraded section of waterbody, but the aspiration is to create a safe riverine environment for all, reconnect and integrate the river corridor back with the adjoining greenspace and public parks, and restore the river so that it is capable of supporting diverse aquatic fauna once more.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|