Case study:Clayton Vale: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
Line 39: Line 39:
{{Monitoring documents end}}
{{Monitoring documents end}}
{{Image gallery}}
{{Image gallery}}
{{Case study image
|File name=River Medlock weir Clayton Vale.png
|Caption=Weir prior to works
}}
{{Image gallery end}}
{{Image gallery end}}
{{Additional Documents}}
{{Additional Documents}}

Revision as of 12:26, 8 June 2013

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

2.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: 53° 29' 30.04" N, 2° 10' 36.62" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country England
Main contact forename Oliver
Main contact surname Southgate
Main contact user ID
Contact organisation Environment Agency
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:River Irwell Restoration Project

This is a parent project
encompassing the following
projects
No
weir removal within Clayton Vale

Project summary

Edit project overview to modify the project summary.


Manchester City Council identified that the Clayton Vale portion of the study area (east of Bank Bridge Road) was occupied by a historical landfill site, which was used for the disposal of ash cinders from the Stuart Street Power Station and as a municipal landfill. Consultants Atkins are in the process of undertaking ground investigations to determine leachate, groundwater and soil contamination including waste characterisation testing to determine the status of these materials and to allow an effective remediation strategy to be developed for the any river channel/corridor restoration works and to prevent the creation of new pollutant linkages or the exacerbation of existing ones, in upstream demonstration area.

It will be a huge achievement if we can restore this most heavily degraded section of waterbody, but the aspiration is to create a safe riverine environment for all, reconnect and integrate the river corridor back with the adjoining greenspace and public parks, and restore the river so that it is capable of supporting diverse aquatic fauna once more.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Subcatchment:River Medlock


Site

Edit site
Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


Weir prior to works


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information