|Total1 cost=700.850 | |Total1 cost=700.850 | ||
}} | }} | ||
{{Motivations}} | {{Motivations | ||
|Biological quality elements=Fish: Species composition | |||
}} | |||
{{Measures | {{Measures | ||
|Floodplain / River corridor=The construction of two fish passes | |Floodplain / River corridor=The construction of two fish passes |
Revision as of 06:37, 22 May 2013
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | In progress |
---|---|
Project web site | |
Themes | Habitat and biodiversity |
Country | England |
Main contact forename | Kevin |
Main contact surname | Sunderland |
Main contact user ID | |
Contact organisation | Leeds City Council |
Contact organisation web site | |
Partner organisations | Envi-ronment Agency, Canoe England, Aire Action Leeds and the West Yorkshire CARP Group |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The outcome of the project is the improvement for fish passage around Kirkstall Island on the River Aire in Leeds by provision of fish passes at St Ann's Mills weir and Burley Mills weir.The fish passes will also benefit the other species which already inhabit the river but are prevented from reaching optimal spawning and feeding grounds.
The weirs are both situated on the left side channel (looking downstream) of Kirkstall Island. There are two weirs on the right side channel but careful consideration has led to the belief that fish will use the left side where the heavier flow is located.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | 500 - 1000 k€ |
Total cost (k€) | 700.850700.85 k€ <br />700,850 € <br /> |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | Fish: Species composition |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | The construction of two fish passes |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information