Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Habitat enhancement of the River Waveney through Bressingham + (Berm feature bressingham.JPG)
- Case study:Minsterley Brook Abandoned Metal Mines + (Minsterley_key_sources_map.jpg)
- Case study:East Tullos Burn Environment Improvements Project + (BeforeProjectPhotographs.pdf)
- Case study:Skjern River Project + (Demolishing pumping station .jpg)
- Case study:Stage 0 channel restoration + (Pre flow conditions.jpg)
- Case study:Oughtershaw NFM + (Scrape.jpg)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (Burcombe post.JPG)
- Case study:Reopening of the culverted Redon river + (Quarry without restoration.png)
- Case study:Kirkstall Valley Weir Fish Passes Project + (The map of the area.JPG)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (Burn Catchment.JPG)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (Hydro power plant (photo. Outi Laamanen).JPG)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (F.png)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (CAYjB9qWMAEBTOk.jpg)
- Case study:Harbertonford Flood Alleviation Scheme + (CNV00014.JPG)
- Case study:East Devon Diffuse Pollution Project + (CPAF.png)
- Case study:Meades water garden regeneration project + (CS pictDS.png)
- Case study:Meades water garden regeneration project + (CS pictUS.png)
- Case study:River Marden at Calne + (Marden before.jpg)
- Case study:Effacement du seuil de Carayon sur le Thoré + (Carayon1.png)
- Case study:Removal of Carleton Hall weir, Eamont Bridge, Penrith, Cumbria + (Carleton Hall weir before removal 5.JPG)
- Case study:Bocq river (Walphy - LIFE project) + (Photo intro.jpg)
- Case study:QUERCUS Dee + (Castle Drive.jpg)
- Case study:Castle Irwell Urban Wetland + (Salford aerial photo showing existing and new basins.jpg)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (17.01.13 clearing.JPG)
- Case study:Glaisdale Beck Restoration Project + (Livestock crossing point.jpg)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Truck arrival.jpg)
- Case study:River Idle Restoration Project + (Bank erosion Manor Farm Scaftworth.jpg)
- Case study:Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria + (Channel1.jpg)
- Case study:Cherry Holme River Island Restoration Phase 2, R.Trent + (691A1889 Cherry Holme Day 1 10 September 2020 lr BEFORE.jpg)
- Case study:Rio Tepice urban restoration + (Bioengineering works.jpg)
- Case study:Chinbrook Meadows Wetlands + (1.1.jpg)
- Case study:River Quaggy- Chinbrook meadows + (Chinbrook meadows before.jpg)
- Case study:Stage 0 channel restoration + (Pre flow conditions.jpg)
- Case study:Chowder Ness Managed Realignment Scheme + (Chowder ness 1.jpg)
- Case study:Houghton 'trout stream' enhancements + (Lamprey Spawing.mov)
- Case study:The Ciobarciu Wetland Project + (Ciobarciu area past situation.jpg)
- Case study:Marking Bradford Beck + (City Centre Plaques Locations Bradford Live Version.jpg)
- Case study:River Little Ouse at Thetford + (Meanders reopened Little Ouse.jpg)
- Case study:Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs + (Clercs1.png)
- Case study:Restauration du matelas alluvial de la Clouère par recharge granulométrique + (Clouere1.png)
- Case study:Welton Farm Landfill/Riverbank Works + (Landfill.jpg)
- Case study:Restoring Brent Rivers and Communities + (LW Deflectors.JPG)