Property:Supplementary funding information
Jump to navigation
Jump to search
This is a property of type Text.
M
26,000 € for land expropriation +
C
A new Roll-on Roll-off terminal was constructed by Associated British Ports (ABP) at Immingham harbour in 2006 on the south bank of the Humber estuary. It resulted in the direct loss of 22 ha of intertidal mudflat and potentially up to 5 ha of indirect losses in the estuary proposed Special Protection Area (now an SPA) and possible Special Area of Conservation (now a candidate SAC). In consultation with regulatory bodies and local nature conservation interest groups, two managed realignment schemes at Chowder Ness and Welwick were identified as contributing to a compensation package for the impact of constructing the new harbour. +
R
A very low cost project thanks to: <br>
- The Environment Agency provided the spoil used in the project from a nearby site (free of charge).<br>
- Free voluntary labour <br>
- Site-sourced tree material <br> +
F
Approximately 440,000 € for land expropriation. The earth moving works (approximately 2 million €) have been carried out in a "compensation" way. +
O
Costs
10,840,000 Danish Kroners (
,971,000 million) support from the Danish Ministry of Food, Agriculture and Fisheries
250,000 DKK (,500) support from Vejle Kommune
11,090,000 DKK (,016,000)
Archaeology survey – 23,000 DKK (,000)
Construction costs – 1,925,000 DKK (0,000)
Administrative costs – 26,000 DKK (,000)
Compensation to landowners – 7,875,000 DKK (
,430,000)
Maintenance of wetland area (grazing) – 985,000 DKK (0,000)
Design and consulting services – 250,000 DKK (,500) +
R
Costs for the last three years of work (2010 to 2013) amount to £60,000 with 4,600 paid-for man hours and 1,200 voluntary hours. This equates to a figure so far of £822 per kilometre with an effort of 87 man hours per kilometre. Two more years of work are estimated (mainly hand-pulling and largely by volunteers), which would add a further 20% to those figures. +
L
Costs only include the acquisition of land. +
B
DARD Rivers contributed 10k towards the overall cost of the project, and acted as contractor for the scheme, employed by the council.. DCAL Inland Fisheries contributed 30k through NASCO (North Atlantic Salmon Conservation Organisation) funding. All other costs covered by Ballymoney Borough Council +
H
De totale kosten van het project bestaan uit een deel traditioneel beekherstel en een deel bouwen met natuur. Gecombineerd zijn de kosten respectievelijk ongeveer €14.000 + €28.000 = €42.000. +
F
Duration 01/07/1998 to 30/12/2003
Total budget 1,902,464.97 €
EU life contribution 760,985.99 € +
R
Duration of the project 01/08/2001 to 28/02/2005
Total budget 737,038.00 €
EU contribution 357,617.00 € +
H
EU contribution 2,184,737.00 € +
D
EU contribution 2,676,579.00 € +
T
Each Test and Itchen River Restoration Strategy project is collaboratively funded 50/50 with the Environment Agency and landowners. +
R
EnviroCentre undertook survey, design and construction support for the installation of green engineering features, based on options appraisal and initial design phase of work carried out by cbec.
Contractor who carried out works: FM Land Ltd, Cromdale, Grantown-on-Spey +
Exact costs for the project are not available but would have been "considerable" given the works required +
E
Funded by the SEPA River Restoration Fund
Scottish Government awarded funding over three financial years 2010-2011, 2011-2012, 2012-2013 +
W
Funded mainly by Defra who commissioned an extensive site investigation/selection programme as well as all the legal, public consultation and scheme-build elements of the project. The landowner, Wallasea Farms Ltd, assisted throughout and was responsible for the submission of the Planning Application and, post-construction, will be responsible for site maintenance. +
R
Funding also provided by the Cinderella Chalk Rivers Project +
B
Funding contributions:
£4,500 Chilterns Chalk Streams Project (incl. officer time)
£2,300 Catchment Partnership Action Fund
£1,250 Chiltern Rangers CIC (staff time)
£150 River Chess Association (1 day at skilled volunteer day rate)
£2,250 Volunteer time (30 volunteer days at unskilled day rate) +