Property:River corridor measure

From RESTORE
Jump to navigation Jump to search

This is a property of type String.

Showing 20 pages using this property.
W
A key achievement of the project was the creation of a new river channel  +, addressing decades of dredging and channelisation that had artificially lowered the river  +, disrupted its natural flow  +,
E
Actions to improve the natural environment: Restoration of the autochthonous riverside vegetation in the sections in which the reedbed is present. It is responsible for the degradation of the autochthonous vegetation  +, in an area which should be a riverside forest with species closer to the ecological climax; Removal of ailanthus and other invasive exotic species.  +
Activation of sidearms  +
S
Adding sinuosity  +, Floodplain reconnection  +, Habitat enhancement  +,
V
Excavation for floodplain creation  +, Requalification and improvement of forestal cover along corridor  +, Alloctone species control  +
S
L
Improving fish migration  +, Alloctone species control  +
T
Fencing  +, Alternative drinkers  +, Nutrient management  +,
R
Barrier removal  +
H
R
Barrier removal  +
L
Barrier removal  +, The blocking of certain grips  +
S
Creation of wetland  +, Barrier removal  +
D
Barrier removal  +, Small scale easement installation  +, Tree plantation  +,
T
D
Barrier removal  +, Small scale easement installation  +, Tree plantation  +,
W
H
Barrier removal  +, Habitat creation  +
B
Barrier removal  +, Connection to wider floodplain  +