1284
U

Property:Project status

From RESTORE
Jump to: navigation, search

This is a property of type String.

The allowed values for this property are:

  • Complete
  • In progress
  • Planned

Pages using the property "Project status"

Showing 50 pages using this property.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

"
"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener +Complete  +
2
2e Lower Woodsford River and Floodplain Enhancement +Complete  +
3
3Rivers - Lumburn:Walkham:Tavy +In progress  +
A
Aaijen- Removal of bank fixation +Complete  +
Abaissement et démantèlement de trois clapets sur l’Orge aval +Complete  +
Abbey Brook Weir +Complete  +
Abbots Worthy Restoration Project +Complete  +
Abbotts Hall Managed Realignment Scheme +Complete  +
Actions for environmental regeneration and flow control in Odra's Basin, Burgos +Complete  +
Adams Mill enhancements +In progress  +
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins +In progress  +
Adare Fish Counter +Complete  +
Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid +In progress  +
Afon Clywdd +Planned  +
Agreed definition of mobility area for the Adour +In progress  +
Albany Park +Planned  +
Albbruck-Dogern (bypass and nature-like pool pass) +Complete  +
Alkborough tidal defence scheme +Complete  +
Allt Lorgy River Restoration +In progress  +
Alma Road Rain Gardens +In progress  +
Amerongse Bovenpolder +In progress  +
Amwell Loop +Planned  +
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot +Complete  +
Ancholme and Coast habitat project +Complete  +
Anton Crescent Wetlands Regeneration +Complete  +
Apelnäs fishway at River Rolfså +Complete  +
Arasement du seuil des Treize Saules sur la Quilienne +Complete  +
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise +Complete  +
Arborfield nature like bypass and weirs project +Complete  +
Arnos Park - Pymmes Brook +Planned  +
Ashlone Wharf FCRM scheme +In progress  +
Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park +Complete  +
Aston Clinton River Restoration +Complete  +
Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria +Complete  +
Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 +Complete  +
Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 +In progress  +
Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-2015 +In progress  +
Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) +Complete  +
Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) +Complete  +
Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) +Complete  +
Austria Urban River Landscape - Urban River Landscape Graz +In progress  +
Austria Urban River Landscape - Urban River Landscape Master Plan Leoben +In progress  +
Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) +Complete  +
Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) +Complete  +
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) +Complete  +
Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) +Complete  +
Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg +Complete  +
Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission +In progress  +
Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 +Complete  +