1284
U

Property:Project status

From RESTORE
Jump to: navigation, search

This is a property of type String.

The allowed values for this property are:

  • Complete
  • In progress
  • Planned

Pages using the property "Project status"

Showing 250 pages using this property.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

"
"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener +Complete  +
2
2e Lower Woodsford River and Floodplain Enhancement +Complete  +
3
3Rivers - Lumburn:Walkham:Tavy +In progress  +
A
Aaijen- Removal of bank fixation +Complete  +
Abaissement et démantèlement de trois clapets sur l’Orge aval +Complete  +
Abbey Brook Weir +Complete  +
Abbots Worthy Restoration Project +Complete  +
Abbotts Hall Managed Realignment Scheme +Complete  +
Actions for environmental regeneration and flow control in Odra's Basin, Burgos +Complete  +
Adams Mill enhancements +In progress  +
Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins +In progress  +
Adare Fish Counter +Complete  +
Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid +In progress  +
Afon Clywdd +Planned  +
Agreed definition of mobility area for the Adour +In progress  +
Albany Park +Planned  +
Albbruck-Dogern (bypass and nature-like pool pass) +Complete  +
Alkborough tidal defence scheme +Complete  +
Allt Lorgy River Restoration +In progress  +
Alma Road Rain Gardens +In progress  +
Amerongse Bovenpolder +In progress  +
Amwell Loop +Planned  +
Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot +Complete  +
Ancholme and Coast habitat project +Complete  +
Anton Crescent Wetlands Regeneration +Complete  +
Apelnäs fishway at River Rolfså +Complete  +
Arasement du seuil des Treize Saules sur la Quilienne +Complete  +
Arasement du vannage du moulin de Réveillon et réaménagement du lit mineur de la Blaise +Complete  +
Arborfield nature like bypass and weirs project +Complete  +
Arnos Park - Pymmes Brook +Planned  +
Ashlone Wharf FCRM scheme +In progress  +
Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park +Complete  +
Aston Clinton River Restoration +Complete  +
Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria +Complete  +
Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 +Complete  +
Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 +In progress  +
Austria Upper Mur - Public relations in murerleben I + II LIFE III (LIFE03 NAT/A/000011) and LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben I+II" 2003-2015 +In progress  +
Austria Upper Mur - River Widening Weyern (LIFE III (LIFE03 NAT/A/000011) Inner-Alpine river basin management – Upper River Mur - murerleben I 2003-2007) +Complete  +
Austria Upper Mur - River widening Lässer Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) +Complete  +
Austria Upper Mur - River widening St. Peter Au (LIFE+ (LIFE+ 08 NAT A 614) Inner-Alpine river basin management – Upper River Mur - murerleben II 2010-2015) +Complete  +
Austria Urban River Landscape - Urban River Landscape Graz +In progress  +
Austria Urban River Landscape - Urban River Landscape Master Plan Leoben +In progress  +
Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) +Complete  +
Austria cross-border section - River widening Sicheldorf (ETZ-Project “DraMurCi” 2009-2013) +Complete  +
Austria cross-border section - River widening measure Gosdorf I (Interreg IIIa Project "Maßnahmen Unteres Murtal" 2002-2007) +Complete  +
Austria cross-border section - River widening measure Gosdorf II (ETZ-Project “DraMurCi” 2009-2013) +Complete  +
Austria/Slovenia Urban River Landscape - ETZ-“Skupaj“ - Joint urban and natural development at the Mur banks in Gornja Radgona and Bad Radkersburg +Complete  +
Austria/Slovenia cross-border cooperation - “Die Murkommission” – Bilateral River Commission +In progress  +
Austria/Slovenia cross-border section - ETZ-Project “DraMurCi” 2009-2013 +Complete  +
Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 +Complete  +
Avon Barriers Project +In progress  +
Avon Barriers Project: Ferengair Weir +In progress  +
B
BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT +Complete  +
Babbs Mill reed bed +Complete  +
Babingley River at Hillington +Complete  +
Bakenhof Dyke reconstruction +Complete  +
Ballinderry Freshwater Pearl Mussel Rescue Project +In progress  +
Barking Creek near A13 +Complete  +
Barking Creekmouth +Complete  +
Barn Elms Sports Ground +Planned  +
Barn Elms Wetland Centre, South West London +Complete  +
Barnes Common +Complete  +
Barnes Common improvements +Complete  +
Barney Beck: Abandoned Metal Mines +In progress  +
Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor +Complete  +
Bastion Maria (QUERCUS) +Complete  +
Bathgate Watercourse Restoration Project +Planned  +
Beam washlands +Complete  +
Beck from the Brink +Complete  +
Beddington Park +Planned  +
Beddington Park Enhancements +Complete  +
Beek Lage Raam +In progress  +
Beekherstel Beekloop +Complete  +
Beekherstel Beekloop BmN +Complete  +
Beekherstel Buurserbeek +Complete  +
Beekherstel Eefsebeek +In progress  +
Beekherstel Keersop +In progress  +
Beekherstel Lactariabeek +Complete  +
Beekherstel Leerinkbeek +Complete  +
Beekherstel Ramsbeek +Complete  +
Beekherstel Reusel Baarschot-Diessen +In progress  +
Beekherstel Willinkbeek +Complete  +
Beekherstel Zuidelijk Afwateringskanaal +In progress  +
Belford Natural Flood Management Scheme, Northumberland +Complete  +
Bell Green Weir fish passage +Complete  +
Beltringharder Koog Regulated Tidal Exchange Scheme +Complete  +
Beneden-Berkel +In progress  +
Beneden-Leeuwen-Side channel +Complete  +
Beverley Brook Flow control structures +Complete  +
Beverley Brook d/s of Rock’s Lane +Planned  +
Beverley Park +Planned  +
Big Yellow +Complete  +
Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras +Complete  +
Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec +Complete  +
Biodiversity conservation and recovery in the river basin Asón +Complete  +
Biologisk återställning i Rolfsåns vattensystem +Complete  +
Biomura LIFE06NAT/SI/000066 +Complete  +
Bird Reserve “Tancat de la Pipa” (Valencia) +In progress  +
Bird reserve “El Clot” (Tarragona) +In progress  +
Bird reserve “Finca San Miguel” (Huesca) +In progress  +
Bird reserve “Las Marismas Blancas” (Cantabria) +In progress  +
Bird reserve “Los Albardales” (Madrid) +In progress  +
Bird reserve “O Grove” (Pontevedra) +In progress  +
Bird reserve “Riet Vell” (Tarragona) +In progress  +
Birkin Brook Habitat Improvements, Cheshire +Complete  +
Blackbrook Slow the Flow, St Helens +In progress  +
Blackhorse Lane Waterfront Park +Planned  +
Blackwater River Habitat Enhancements & Fish Passage +In progress  +
Blake Avenue, Mayes Brook +Planned  +
Blanice River +Complete  +
Blauwe Kamer +Complete  +
Bleinheim Palace Project +Complete  +
Bockhampton Enhancement +Complete  +
Bocking Blackwater River Restoration +In progress  +
Bocq river (Walphy - LIFE project) +Complete  +
Bonesgate Phase 2 +Complete  +
Boosting slivso +Complete  +
Borova Stream and its Revitalisation +Complete  +
Borrowash fish pass +Complete  +
Bosgården nature-like fishway at River Rolfså +Complete  +
Boston Manor +Planned  +
Boulder Pool and Plough Lane +Planned  +
Bourne End Recreation Ground River Enhancement Project +Complete  +
Bow Brook Floodplain Restoration +Complete  +
Bow Brook Living Landscape +Complete  +
Bowthorpe Meadow, River Yare +Complete  +
Brackenhurst Natural Flood Management +In progress  +
Braid Burn at Inch Park +Complete  +
Brent Lodge Park Improvement +Planned  +
Brent River Improvement Project- Brent Lodge Park to Ruislip Road Eastruislip +Complete  +
Brent River Park Phase II +Planned  +
Brightside Weir Fish Pass +Complete  +
Bringing Back the Bulbourne +Complete  +
Bristol Frome Diffuse Pollution Project +Complete  +
Broadway Fields/ Seagers Distillary +Planned  +
Brook Ramlösa-Restoration of agricultural stream +Complete  +
Broom Road Recreation Ground +Planned  +
Buenz +Complete  +
Built Kjøsnesbekken in the river Stjørdalselva +Complete  +
Buiten Ooij +Complete  +
Bullhead Dock and Bellamy’s Wharf - Rotherhithe +Complete  +
Bures Mill fish by-pass +Complete  +
Burn of Balmaleedy Restoration, Marykirk +In progress  +
Burn of Mosset, Forres +Complete  +
Burton Weir (Upper) Fish Pass Project +Complete  +
Bury Lodge Wetlands +In progress  +
Butter Hill Phase 2 +Complete  +
Buzzards Mouth Creek +Planned  +
C
CASE STUDY OF QUALITY IMPROVEMENT IN SHROPSHIRE WILDLIFE TRUST AREA +Complete  +
Cain weir removal +In progress  +
Camargue’s former saltworks +In progress  +
Cardiff Rivers Group +In progress  +
Carnon River: Abandoned Metal Mines +In progress  +
Case study:Biological protection shield to control streambank erosion in Ätran 2 +Complete  +
Castle Acre Rehabilitation Project +Complete  +
Castle Irwell Urban Wetland +Complete  +
Catford Greyhound Stadium +Planned  +
Chambers Wharf +Complete  +
Channel Sea +Planned  +
Charlton St Peter A 8 +Complete  +
Chase Nature Reserve +Complete  +
Chelmer Valley Local Nature Reserve +Complete  +
Cheriton Stream Restoration Project +Complete  +
Chertsey meads +Complete  +
Chiese river upstream Idro lake – Trentino region +Complete  +
Chigwell Brook +Complete  +
Ching Brook at Walthamstow Greyhound Stadium +Planned  +
Chowder Ness Managed Realignment Scheme +Complete  +
Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) +Complete  +
Civic Way, Yeading Brook +Complete  +
Clayton Vale +In progress  +
Clitherow's Island, Brentford eel pass +Complete  +
Clugston Burn (CASS) +Complete  +
Colfes School +Planned  +
Colliers Row +Planned  +
Colne Brook +Planned  +
Colne Water Restoration Project +In progress  +
Columbia Wharf +Planned  +
Comal River Restoration +In progress  +
Community Wetlands +Complete  +
Compton Island and Meanders +Complete  +
Coniston Cold weir removal +Complete  +
Connswater Community Greenway +Complete  +
Conservation of alluvial +Complete  +
Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration +Complete  +
Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration +Complete  +
Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. +Complete  +
Contournement d’un plan d’eau de loisirs sur le Gratteloup au niveau de la commune de La Ville-aux-Clercs +Complete  +
Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros +Complete  +
Corfe River +Complete  +
Cornmill Gardens (QUERCUS) +Complete  +
County Gardens, Mayes Brook +Planned  +
Coutershaw FIP Project +Complete  +
Craigton Riparian and NFM Orchard Planting +Complete  +
Crane Meadows Meander Connections +Complete  +
Crane Park +Planned  +
Cranford Park Phase 2 +Complete  +
Cray River Enhancement +Complete  +
Creamery Weir fish barrier easement +Complete  +
Creating a fishpass at Włocławek dam +Complete  +
Creation and restoration of a riparian zone +Complete  +
Creation of a Constructed Farm Wetland +Complete  +
Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze +Complete  +
Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita +Complete  +
Crosthwaite Deculverting +Complete  +
Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes +Complete  +
Cuckolds Haven Nature Area +Complete  +
Cuddington Park +Planned  +
Cudworth dyke restoration project +Planned  +
Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria +Complete  +
Cumbria River Restoration Strategy +In progress  +
D
Dagenham Brook de-silting +Complete  +
Dagenham Washlands Phase 2 +Complete  +
Dam removal at Grönkullen, River Rolfsån +Complete  +
Dam removal in River Stenån +Complete  +
Darent Valley Path +Planned  +
Darley Abbey Fish Pass Project +Complete  +
Day Brook Rain Gardens +Complete  +
Day Brook Restoration - Gedling +Complete  +
Ddu Restoration Project +In progress  +
De-culverting Moselle Brook at Lordship Recreation Ground +Complete  +
Debenham Flood Storage Options - flood modelling and economic assessment +Planned  +
Defra Strategic Environmental Partnership Project (DSEPP) 2011 +Complete  +
Delivering Multiple Benefits for Water on Foston Brook +In progress  +
Demolition of weir on the River Nora, Nalón Basin +Complete  +
Derbyshire Habitat Improvements +Complete  +
Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area +Complete  +
Devon Beaver Project and River Otter Beaver Trail +In progress  +
Diffusing the Issue in Rural Ribble - River Loud +In progress  +
Diffusing the Issue in rural Ribble +In progress  +
Diffusing the Issue in rural Ribble - Easington +In progress  +
Diffusing the Issue in rural Ribble - Skirden Beck +In progress  +
Diffusing the Issue in rural Ribble - Stock Beck +In progress  +
Diffusing the Issue in rural Ribble - Swanside +In progress  +
Diversion of the River Nith +Complete  +
Dommeldal: cross-border habitat restoration in the Dommel Valley +Complete  +
Dorset CPAF Projects +Complete  +
Dove Weir removal +Complete  +
Dovers Corner +Planned  +
Downham Playing Fields +Complete  +
Downton Millennium Gardens- Hampshire Avon +Complete  +
Doñana 2005 +Complete  +
Drayton +Complete  +
Dunruchan Farm Peatland Restoration Project +Complete  +
Dunston Beck Restoration +Complete  +
Durand Close +Planned  +
Démantèlement de l’ouvrage du Pont Fourneau sur la Selle +Complete  +
Démantèlement de neuf ouvrages sur le cours de l’Aa +Complete  +
Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas +Complete  +