Property:Picture description
Jump to navigation
Jump to search
This is a property of type String.
R
Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" +
"Dolna topchia" Reserve +
"Zlato Pole" Protected Area +
B
100m backwater channel (Sept 2013) +
T
2. Newly restored stretch of stream Texas Valley, one year after implementation of restoration measures, i.e. March 2017. Photo: Kari Nordkvinne/NIVA. +
D
2. The Texas Valley stream one year after daylighting. July 26th 2017. Photo: Kari Nordkvinne/NIVA. +
T
2. The Texas Valley stream one year after daylighting. July 26th 2017. Photo: Kari Nordkvinne/NIVA. +
A River Restoration Centre Members site visit (June 2014) where Test and Itchen Project Officer, Heb Leman (Environment Agency), explained the aims of the restoration strategy. Photo © RRC +
A culvert and a weir on the Kirklees Brook +
R
A few months after restoration +
A flow deflector installed on the River Brett upstream of Shelley Bridge +
A graphic of the proposed scheme +
C
A graphic of what Chambers Wharf will look like +
E
A gravel bar formed at the confluence of the River Crouch and Runwell Brook +
F
A new backwater +
W
A new bypass weir (Canal and Rivers Trust) +
R
A newly opened (macrophyte removal) section of Børselva, including sedimentation pond (far left) and consecutive constructed wetlands. Source: Aanes et al 2016 (NIVA report 6900-2015) +
C
A picture taken in May 2024 of two of the four wetland cells +
S
A redundant gauging station before works started +
R
A view of Rio San Martino in one of the restored portions +
A weir after restoration of the river bed. +