File:Jan 2009 Opening meanders.JPG

From RESTORE
Jump to navigation Jump to search

Original file(1,439 × 1,080 pixels, file size: 359 KB, MIME type: image/jpeg)

January 2009 - During works. New meander channel cut off-line and connected to the existing channel in stages once complete. The downstream end of each meander was opened up first and allowed to fill with water. Each meander was left for a period to allow sediments to settle and reduce the potential for dirty water to pass downstream before the upstream was slowly opened. ©AECOM

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current10:26, 8 July 2013Thumbnail for version as of 10:26, 8 July 20131,439 × 1,080 (359 KB)NickRRC (talk | contribs)January 2009 - During works. New meander channel cut off-line and connected to the existing channel in stages once complete. The downstream end of each meander was opened up first and allowed to fill with water. Each meander was left for a period to allow

The following page uses this file: