File:20200114 095551.jpg
Original file (3,166 × 2,660 pixels, file size: 7.23 MB, MIME type: image/jpeg)
Bobowa (km 58+700 Biala river). New construction finished in 2018. In upstream circa 150 m above existing weir fish ramp was built. Below was 70 m length pool and downstream rebuilded old weir with stilling basin. The crest was slightly forged and in the middle triangle overflow was cuted. A triangular spillway was also cut out in end sill of countersill. The structure was supported by loose riprap and a row of sandstone boulders.The soil that had been deposited over the years under the bridge message was removed. The riverbed widened. The conditions for the flow of great waters have improved.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 08:19, 12 March 2020 | 3,166 × 2,660 (7.23 MB) | KarCie (talk | contribs) | Bobowa (km 58+700 Biala river). New construction finished in 2018. In upstream circa 150 m above existing weir fish ramp was built. Below was 70 m length pool and downstream rebuilded old weir with stilling basin. The crest was slightly forged... |
You cannot overwrite this file.
File usage
The following page uses this file: