Category:Imported case study
Jump to navigation
Jump to search
(previous page) (next page)
This category contains all case studies that were imported from Excel spreadsheets, via the conversion tool and Special:ImportXML.
Pages in category "Imported case study"
The following 200 pages are in this category, out of 424 total.
(previous page) (next page)A
- Case study:Aaijen- Removal of bank fixation
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins
- Case study:Agreed definition of mobility area for the Adour
- Case study:Amwell Loop
- Case study:Arnos Park - Pymmes Brook
- Case study:Ashlone Wharf FCRM scheme
B
- Case study:Barn Elms Sports Ground
- Case study:Barn Elms Wetland Centre, South West London
- Case study:Barnes Common
- Case study:Barnes Common improvements
- Case study:Barton Brook
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor
- Case study:Beddington Park
- Case study:Beddington Park Enhancements
- Case study:Bell Green Weir fish passage
- Case study:Beneden-Leeuwen-Side channel
- Case study:Beverley Brook d/s of Rock’s Lane
- Case study:Beverley Brook Flow control structures
- Case study:Beverley Park
- Case study:Big Yellow
- Case study:Biodiversity conservation and recovery in the river basin Asón
- Case study:Biologisk återställning i Rolfsåns vattensystem
- Case study:Biomura LIFE06NAT/SI/000066
- Case study:Blackhorse Lane Waterfront Park
- Case study:Blake Avenue, Mayes Brook
- Case study:Bleinheim Palace Project
- Case study:Bonesgate Phase 2
- Case study:Boosting slivso
- Case study:Boston Manor
- Case study:Boulder Pool and Plough Lane
- Case study:Brent Lodge Park Improvement
- Case study:Brent River Park Phase II
- Case study:Broadway Fields/ Seagers Distillary
- Case study:Broom Road Recreation Ground
- Case study:Buenz
- Case study:Buiten Ooij
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe
- Case study:Bury Lodge Wetlands
- Case study:Buzzards Mouth Creek
C
- Case study:Catford Greyhound Stadium
- Case study:Channel Sea
- Case study:Chase Nature Reserve
- Case study:Chertsey meads
- Case study:Chiese river upstream Idro lake – Trentino region
- Case study:Chigwell Brook
- Case study:Ching Brook at Walthamstow Greyhound Stadium
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia )
- Case study:Civic Way, Yeading Brook
- Case study:Clitherow's Island, Brentford eel pass
- Case study:Colfes School
- Case study:Colliers Row
- Case study:Colne Brook
- Case study:Columbia Wharf
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara.
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros
- Case study:County Gardens, Mayes Brook
- Case study:Crane Park
- Case study:Cranford Park Phase 2
- Case study:Cray River Enhancement
- Case study:Creation and restoration of a riparian zone
- Case study:Cuddington Park
- Case study:Cumbria Angler Engagement
D
- Case study:Dagenham Brook de-silting
- Case study:Dagenham Washlands Phase 2
- Case study:Darent Valley Path
- Case study:Demolition of weir on the River Nora, Nalón Basin
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area
- Case study:Diffusing the Issue in rural Ribble
- Case study:Diffusing the Issue in rural Ribble - Easington
- Case study:Diffusing the Issue in rural Ribble - Skirden Beck
- Case study:Diffusing the Issue in rural Ribble - Stock Beck
- Case study:Diffusing the Issue in rural Ribble - Swanside
- Case study:Dove Weir removal
- Case study:Dovers Corner
- Case study:Doñana 2005
- Case study:Durand Close
E
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3
- Case study:Ecological Restoration of Mata-Radeanu Complex
- Case study:Ecological Restoration of Natural Lake Pochina
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin
- Case study:Ecological Restoration of Vlascuta Lake
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA
- Case study:EDF Weir removal
- Case study:Edgeware Brook, Honeypot Lane
- Case study:Eel Pass over tilting weir at Ravensbury Park
- Case study:Elmbridge Meadows
- Case study:Ems floodplain
- Case study:Enhancements in Hampstead Heath
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba)
- Case study:Environmental improvement project of the stream of Ruby
- Case study:Environmental regeneration project in Magro river bed
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias)
- Case study:Environmental restoration of the river Zújar
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental)
- Case study:Essex Healthy Headwaters River Restoration Project
- Case study:Essex Wharf
F
- Case study:Fairlop Plain and Fairlop Water
- Case study:Farm Irrigation Trials
- Case study:Farming with water - Ullswater Catchment
- Case study:Fazakerley Brook Wetland
- Case study:Ferry Lane North drainage realignment
- Case study:Fish and Flow at Arcadia - Phase 2
- Case study:Fishery/habitat enhancement on the Grand Union Canal
- Case study:Fluvial improvement in Riera de Caldés
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain
- Case study:Fluvial restoration in River Carrión
- Case study:Fluvial river restoration of Tordera in Sant Celoni
- Case study:Fluvial river restoration of Tordera in Tordera
- Case study:Fordmill weir
- Case study:Fresh Wharf
- Case study:Friary Park
- Case study:Friern Barnet Former Sewage Works
- Case study:Frog Island
G
- Case study:Garratt Park
- Case study:Goodmayes Park, Mayes Brook
- Case study:Goresbrook and Ship and Shovel Sewer
- Case study:Goresbrook Park
- Case study:Guadiamar Green Corridor Project
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development
H
- Case study:Habitat and water flow restoration on River Rábca
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer
- Case study:Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration
- Case study:Habitat Improvements on the River Colne at West Drayton
- Case study:Hackbridge Restoration
- Case study:Hackbridge weir notch
- Case study:Hackney Marsh recreation grounds
- Case study:Hackney Marshes - Wick Field recreation ground
- Case study:Hale Wharf
- Case study:Hall Place weir modification
- Case study:Hampton Court Palace
- Case study:Harrow Lodge Park
- Case study:Haynes Park
- Case study:Hogsmill River Connectivity Project
- Case study:Hogsmill Sewage Treatment Works phase 1
- Case study:Hollyoak Wood and Willersley Park
- Case study:Horne Way Weir
- Case study:Hospital Bridge Road
- Case study:HPP Blanca
- Case study:Hurst Park
I
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage.
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora)
- Case study:Improving the structure of the Lahn-patak in Hungary
- Case study:Improving water quality in Loweswater
- Case study:Inchewan Burn Bed restoration
- Case study:Increased biodiversity, river Llobregat, Sallent.
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation
- Case study:Isar-Plan
K
L
- Case study:Ladywell Fields (QUERCUS)
- Case study:Ladywell Fields Phase 2
- Case study:Ladywell Fields to Cornmill Gardens
- Case study:Ladywell Fields toeboarding
- Case study:Lake District Foundation - Building future environmental investment
- Case study:Land at Buzzards Mouth Creek
- Case study:Land opposite Wanstead Park
- Case study:Langford Lakes project
- Case study:Langonnet river
- Case study:Laymer Road Silt Trap and Recreational Ground
- Case study:Lea Bridge Waterway Wall Improvements
- Case study:Lee Navigation by Walthamstow Marshes
- Case study:Lek Bij Everdingen
- Case study:Lewisham College weir
- Case study:Lidl
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica
- Case study:Linear Park
- Case study:Lippeaue Klostermersch
- Case study:Llobregat river restoration
- Case study:Love My River Douglas
- Case study:Loxford Water
- Case study:Lullingstone Castle phase 2
M
- Case study:Malden Golf Course
- Case study:Manor House Gardens
- Case study:Manor House Gardens Gauging Station
- Case study:Marsh restoration on the Merlue
- Case study:Matasaru Area - A new life on the river Arges
- Case study:Meades water garden regeneration project
- Case study:Medland Close, River Wandle
- Case study:Meers - Floodplain lowering
- Case study:Melling Brook
- Case study:Merdian Water development site
- Case study:Merton Abbey Mills Eel Pass
- Case study:Mid Thame RIver and Floodplain Project
- Case study:Mill Green
- Case study:Mill Road Weir
- Case study:Millingerwaard-Floodplain rehabilitation
- Case study:Moor Lane Allotments
- Case study:Morava restoration project
- Case study:Morden Hall
- Case study:Morden Hall Park Water Vole Habitat Enhancement