Case study:Zero river restoration project
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Land use management - agriculture, Land use management - forestry, Monitoring, Social benefits, Water quality |
Country | Italy |
Main contact forename | Paolo |
Main contact surname | Cornelio |
Main contact user ID | |
Contact organisation | p.cornelio@acquerisorgive.it |
Contact organisation web site | http://www.acquerisorgive.it/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Consorzio di Bonifica Acque Risorgive (drainage authority) is located within the pumped drainage landscape of the Venice Lagoon. The Consorzio was involved in a large programme aimed at developing a catchment strategy to reduce nutrient loads entering the Venice Lagoon from its tributaries. To achieve this goal, the Consorzio planned a major river restoration project for the Zero River, which drains into the lagoon.
The main restoration actions carried out regarded: banks widening, increase of aquatic vegetation on river terraces, creation of lateral and inflow wetland (ponds and lakes) and creation of wooded riparian area irrigated by river water.
Within this project a pilot experimental system was built along the Zero River, to evaluate in particular the buffering efficiency of the wooded areas on non-point pollution sources of nitrogen.
On the experimental site, represented by a newly-established riparian woodland, the hydrology of the woodland is totally regulated through a series of pumps which irrigate the woodland with water coming from Zero River, through a series of parallel ditches (irrigation and drainage ditches).
The results of this study provided useful data and know-how for improving the management of riparian buffer zones.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Pagana canal restoration project, Rio San Martino and Piovega di Scandolara restoration project, Rio Sant'Ambrogio restoration project, Salzano wetland and Marzenego river restoration project, Scolo Desolino restoration project
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|