Case study:Valtellina 2005 – New green system

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 46° 8' 32.97" N, 9° 35' 29.62" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Italy
Main contact forename Italo
Main contact surname Buzzetti
Main contact user ID
Contact organisation ERSAF – Unità Operativa di Morbegno (SO)
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:"Parco della Bosca" restoration

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


3 years monitoring to reduce alloctone species recolonisation.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Padano
River basin Fiume Po

Subcatchment

River name Adda
Area category
Area (km2)
Maximum altitude category more than 2000 m
Maximum altitude (m) 2237 m2.237 km <br />223,700 cm <br />
Dominant geology Siliceous
Ecoregion Alps
Dominant land cover Woodland
Waterbody ID



Site

Name Parco della Bosca
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology wandering
Reference morphology wandering
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Quick run-off
Dominant substrate Cobble
River corridor land use Intensive agriculture
Average bankfull channel width category more than 50 m
Average bankfull channel width (m) 7575 m <br />0.075 km <br />7,500 cm <br />
Average bankfull channel depth category 02/05/12 m"02/05/12 m" is not in the list (Less than 0.5 m, 0.5 - 2 m, 2 - 5 m, 5 - 10 m, more than 10 m) of allowed values for the "Average channel depth category" property.
Average bankfull channel depth (m) 3.5 m0.0035 km <br />350 cm <br />
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient 0.005
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 2000 m2 km <br />200,000 cm <br />
Project started 2006/06/01
Works started 2009/06/01
Works completed 2010/11/01
Project completed
Total cost category 1000 - 5000 k€
Total cost (k€) 1058 k€1,058,000 € <br />
Benefit to cost ratio
Funding sources Regione Lombardia and sediments sellling, Lombardia Region

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design 10 - 50 k€ 27 k€27,000 € <br /> Forest Service - Sondrio County Paola Bianchi
Stakeholder engagement and communication
Works and works supervision 500 - 1000 k€ 970 k€970,000 € <br /> ERSAF – Morbegno (SO) Italo Buzzetti
Post-project management and maintenance 50 - 100 k€ 54 k€54,000 € <br /> ERSAF – Morbegno (SO) Italo Buzzetti
Monitoring



Reasons for river restoration

Mitigation of a pressure Riparian development, Flood defence
Hydromorphology Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Recreation, Community demand, Landscape enhancement


Measures

Structural measures
Bank/bed modifications reforestation, Reduction of bank slope
Floodplain / River corridor Excavation for floodplain creation, Requalification and improvement of forestal cover along corridor, Alloctone species control
Planform / Channel pattern
Other
Non-structural measures
Management interventions Monitoring strategy
Social measures (incl. engagement)
Other Consultation


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information