Case study:Vallacuera Ravine. Removal of a dyke

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 42° 20' 41.09" N, 1° 47' 17.82" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Flood risk management, Habitat and biodiversity, Land use management - agriculture
Country Spain
Main contact forename Fernando
Main contact surname Mendoza
Main contact user ID
Contact organisation Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A.
Contact organisation web site http://www.gavrn.com/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The dike built in the 80’s after the canalization works carried out in Arga River was removed to recover the natural floodplain in one of the tributaries’ confluence: Vallacuera stream. The main objective of this project is to restore the river Arga natural floodplain by removing the dyke and increasing the fluvial territory. There are other secondary objectives: to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola); creating new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 92D0 (tamarisk plantation); spatial planning for cattle. The project has a total budget of 138.840,25€ and is financed by GERVE-LIFE project, INTERREG GIRE project, "Gestión Ambiental, Viveros y Repoblaciones de Navarra, S.A." and Government of Navarre.

Construction new habitats for otter (Lutra lutra) and European turtle (Emys orbicularis).

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Aerial view of Vallacuera ravine
Mouth of the ravine before the actuation
Artificial pond in the area
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H.Ebro
River basin Arga

Subcatchment

River name Arga
Area category
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 286 m0.286 km <br />28,600 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Site

Name Barranco de Vallacuera
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Embanked
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Silt, Clay
River corridor land use
Average bankfull channel width category more than 50 m
Average bankfull channel width (m) 120120 m <br />0.12 km <br />12,000 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s) 33 m³/s <br />3,000 l/s <br />
Average channel gradient category
Average channel gradient 0.003
Average unit stream power (W/m2) 0.7355250.736 W/m² <br />


Project background

Reach length directly affected (m) 1000 m1 km <br />100,000 cm <br />
Project started 2006/09/01
Works started
Works completed 2007/04/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 138 k€138,000 € <br />
Benefit to cost ratio
Funding sources Government of Navarra, Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A., LIFE GERVE, INTERREG

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Flood defence
Hydromorphology Channel pattern/planform, Width & depth variation
Biology
Physico-chemical
Other reasons for the project Flood risk management


Measures

Structural measures
Bank/bed modifications New bioengineering elements in order to stabilize slope banks
Floodplain / River corridor Removal of exotic plants, Conditioning access to properties and pedestrian paths, Habitat creation
Planform / Channel pattern Removal of a dyke
Other
Non-structural measures
Management interventions Reduce the risk of flooding downstream
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Channel pattern/planform Yes Awaiting results
Width & depth variation Yes Awaiting results

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flood defense Yes Yes Yes Improvement


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information