Case study:Uiterwaardvergraving Keizers- en Stobbenwaarden en Olsterwaarden

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 16' 31.23" N, 6° 7' 32.53" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.ruimtevoorderivier.nl/waar-doen-we-dit/projecten/overijssel/uiterwaardvergraving-keizers-en-stobbenwaarden-en-olsterwaarden/
Themes Flood risk management, Habitat and biodiversity
Country Netherlands
Main contact forename Wim
Main contact surname van Vilsteren
Main contact user ID
Contact organisation Waterschap Groot Salland
Contact organisation web site http://www.wgs.nl/veilige-dijken/ruimte-voor-de/deventer-ruimte-0/
Partner organisations Natuurderij
Parent multi-site project

Case_study:Room for the River

This is a parent project
encompassing the following
projects
No
Munnikenhank (courtesy of Rijkswaterstaat)

Project summary

Edit project overview to modify the project summary.


For 7,5km along the IJssel river, more room for the river will be created in a number of locations, by digging away river foreland and creating side gullies. This will allow better and quicker drainage of large volumes of water, can contribute to creating more natural conditions.


For more information go to http://issuu.com/ruimtevoorderivier/docs/uiterwaardvergraving_deventer_kso (Dutch)

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Rhine
River basin Rijndelta

Subcatchment

River name IJssel
Area category more than 10000 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Central Plains
Dominant land cover Intensive agriculture, Urban
Waterbody ID



Other case studies in this subcatchment: Vreugderijkerwaard side channel


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use Improved/semi-improved grassland/pasture
Average bankfull channel width category more than 50 m
Average bankfull channel width (m) 100100 m <br />0.1 km <br />10,000 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information