Case study:The restoration of the Sotovo lake: Volga-Akhtuba floodplain

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 48° 31' 56.16" N, 44° 51' 33.13" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity, Monitoring, Social benefits
Country Russia
Main contact forename Dmitry
Main contact surname Zolotarev
Main contact user ID User:Dzolotaryov
Contact organisation UNDP
Contact organisation web site
Partner organisations Coca-Cola, Volzhsky Institute of Humanities, Volgograd State Socio-Pedagogical University, Nature Park "Volga-Akhtuba Floodplain"
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


Volga-Akhtuba floodplain is one of the biggest floodplains in Europe. The lower part of the Volga basin (downstream Volgograd and Volzhskaya hydro-electric power station) remains more or less in its natural conditions while the rest of the Volga river represents the cascade of the dams and reservoirs for electric power production. During the hydrological monitoring which our group (Filippov O.V.) has started at 2001 it has been found out that some territories of the floodplain (some local ecosystems) have been very depressed. The reasons for such a situation are: 1. construction of the Volzhskaya HPP in 1958 which has been regulating the discharge of the water in the following way: the amount of the water hasn’t been changed but the distribution has been violated (winter discharges became larger; summer – less); 2. Local population during decades has used the territory for agriculture – plant growing and local dikes and dams were needed; 3. One of such places – the lake Sotovo – was surrounded with dikes to prevent flooding to come to the neighboring territories which were used for gardening. In 2006 the UNDP project named “Conservation of Wetlands Biodiversity in the Lower Volga Region” started. The group of scientists with the specialists of the project discussed some places for restoration in the floodplain and the Sotovo Lake was chosen. The lake was completely dried out because as we found out later it was surrounded with dikes and the paths for water from the river which should feed the lake from upper flow were closed. The main aim was to re-install the natural flooding regime at the Sotovo lake. To reach the aim it was decided to remove some parts of the earthen dike and to construct an installation (dam) for water level regulation.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information